Supporting Documentation · Sep 17, 2026
M_ZB 15 Alan St Variance_Garage Improvements 05292026 rcd 6 1 2026
55ca9172a3820acc3d6d9ca4cde9e2cf0bb806f175e66fcb08321edda6e38a43Indexed text · page 6
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org Not Addressed. Applicant’s professional shall provide testimony acknowledging the requirement of Certification that the garage improvements were constructed according to the design submitted. 5.15 We recommend an “As-Built Topographic Plan” be submitted prior to the issuance of a certificate of occupancy; Not Addressed. The Applicant shall provide testimony acknowledging the submission of an “As-Built Topographic Plan”. VI. PERMITS 6.1 Should the Board approve this application: 6.1.1 Certification from Hudson-Essex-Passaic Soil Conservation District will be required if more than 5,000 SF 6.1.2 Soil removal permit will be required if more than 300 CY of soil will need to be moved 6.1.3. A Street opening permit is required for any work within the ROW. 6.1.4 A tree removal application and permit will be required from the Township forester if any trees need to be removed. ZC/jrm
File revisions (1)
- Sep 29, 2026
55ca9172a382598,195 bytes