BOARD APPROVAL: BD. ENGINEER: Roof Leader: Downspout drains into 3" pipe that connects to house gutter system as existing. Roof Leader: Downspout drains onto driveway as existing SECRETARY: OWNER-PREPARED EXHIBIT Max Grossman Block 146, Lot 72, West Orange, NJ DATE: DATE: PROJECT: LOCATION: CHAIRMAN: OWNER: SHEET: DATE:OWNER SIG: DATE: Garage Expansion — 15 Alan Street Roof Overhangs: 1'8" on sides of building 1' on front and back of building Comes to a 4' total projected point to cover exposed ridge beam at front of building. Second floor "shed dormer" projects 1' past wall line PROJECT INFORMATION Project: Garage Expansion at 15 Alan Street Property Address: 15 Alan Street, West Orange, NJ 07052 Block / Lot: Block 146, Lot 72 Zoning District: R-T Two-Family Residential Application Type: "C" Variance (C-2 Bulk Variance) Property Owner / Applicant: Max Grossman STATEMENT OF AUTHORSHIP The drawings and renderings attached to this cover sheet are illustrative exhibits prepared by the property owner, Max Grossman, in support of the above-referenced "C" Variance application. These exhibits are submitted pursuant to the exemption set forth in N.J.S.A. 45:3-5, which permits an owner of a one- or two-family dwelling, or accessory structure thereto, to prepare drawings for their own property without the involvement of a licensed architect. These owner-prepared exhibits are intended to be illustrative only and are submitted alongside, and in addition to, the stamped engineering plans prepared by Yogi Engineering through consultant Seva Engineering (Sanjay N. Patel, P.E.), dated February 27, 2026. The stamped engineering plans, and not these owner-prepared exhibits, are the controlling documents for the technical and structural aspects of the proposed work. Plans made to scale using survey provided by Richard J. Hingoes. Dated 11/19/2018 All disturbed areas shall be restored, topsoiled, and seeded within 7 days of the completion of construction. Existing Plan w/proposed foundation Proposed new foundation: Asphalt driveway to be excavated and replaced with concrete Proposed East Elevation of Site Plan Oriented N-S Proposed area of disturbance South Elevation N East Elevation N 2 trees near the work area: The tree located in the rear yard of 15 Alan street is outside the disturbance zone and will be unaffected by the construction. The tree belonging to 58 valley way
vation N 2 trees near the work area: The tree located in the rear yard of 15 Alan street is outside the disturbance zone and will be unaffected by the construction. The tree belonging to 58 valley way that overhangs the existing structure is tall enough to be uanffected. See document labeled "Tree protection plan"
File revisions (1)
- Sep 29, 2026
e4d8ab1d588010,023,615 bytes