Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2026

26 07 08 Consulting Engineer Review 4 rcd 7 8 2026

Preserved file SHA-2560312afdd42096fc60de75c9805573fdb8b004932b1a054d756103dcbc7a5b191

Indexed text · page 2

Show all pages
Page 2

Page 2 of 6 • A Stormwater Management, Water Quality and Groundwater Recharge Analysis prepared by Rodman R. Ritchie, PE, PP and bearing a latest revision date of May 2026. Included with the report is a set of Drainage and Inlet Area Maps (3 sheets) prepared by Dynamic Engineering dated July 16. 2025. • A Stormwater Management Operation and Maintenance Manual prepared by Rodman R. Ritchie, PE, PP and bearing a latest revision date of May 2026. • A print of an ALTA/NSPE Land Title Survey (1 sheet) prepared by James A. Conway Jr., PLS with Dynamic Survey, LLC of Newark, New Jersey and bearing a latest revision date of December 17, 2024. • A Geotechnical Engineering Report prepared by Stephen F. Patt, PE and Jeffrey C. Yates, PE with ECS Mid-Atlantic, LLC of Moorestown, New Jersey dated December 10, 2024. • Addendum No. 1 – Results of Test Pit Excavation and Infiltration Testing prepared by Jeffrey C. Yates, PE and Stephen F. Patt, PE with ECS Mid-Atlantic, LLC dated January 29, 2025. • A Tree Removal Report prepared by Michael LaLana, LTE and Marla A. Roller, LLA with Dynamic Engineering of Marlton, New dated March 2026. • A copy of a May 5, 2026 letter from Rodman R. Ritchie, PE and Andrew Haupin, PE to the West Orange Township Zoning Board which addresses the comments in our March 25, 2026 engineering review letter and the March 25, 2026 planning review letter from Christopher N. Dochney, PP. • A Consulting Report prepared by Christine A. Nazzaro-Cofone, PP with Cofone Consulting Group of Red Bank, New Jersey dated February 17, 2026. • A completed Application Form dated July 16, 2025. • A Disclosure of all entities and individuals having a ten percent (10%) or greater interest in Mavis Tire Supply LLC. • A completed Application for Tree Removal & Replacement Permit dated August 11, 2025. • A completed Township of West Orange Application for Stormwater Permit dated February 6, 2026. • A completed Site Plan/Subdivision Checklist. • A completed Sustainability Checklist Form. • A completed Grading Plan Design Items - Checklist. • A Preliminary List of Variances & Waivers prepared by Dynamic Engineering Consultants, PC dated February 2026 • A July 9, 2025 Buffer Report from the Office of the Assessor which lists the properties within 200 ft of Block 105, Lot 64.01. • A copy of a July 8, 2025 Verification of Taxes & Sewer Charges Paid from the Office of the Tax

Page 2

eport from the Office of the Assessor which lists the properties within 200 ft of Block 105, Lot 64.01. • A copy of a July 8, 2025 Verification of Taxes & Sewer Charges Paid from the Office of the Tax Collector which states that the taxes are paid until July 31, 2025, the 2024 sewer charges have been paid and the 2025 sewer charges have not yet been billed. • Copies of various deed documents for the property in question.

File revisions (1)