Supporting Documentation · Jul 16, 2026
26 07 08 Consulting Engineer Review 4 rcd 7 8 2026
0312afdd42096fc60de75c9805573fdb8b004932b1a054d756103dcbc7a5b191Indexed text · page 6
Show all pagesPage 6 of 6 shown, a separation of 6” will be provided from the pipe invert to the basin bottom, not from the bottom of the pipe to the basin bottom. This discrepancy must be resolved. D. LANDSCAPING COMMENTS 1. As recommended in our March 25, 2026 review letter, an oak tree should be provided at the northeast corner of the site in maintain the same quantity of street trees. In addition, the oaks should be in the white oak family due to bacterial leaf scorch (BLS). E. LIGHTING COMMENTS 1. The plans have been revised to propose timers for the light fixtures. The proposed hours of operation for the lights should be indicated on the plans. Our office recommends that light levels be reduced or turned off 1 hour after the close of work to reduce light pollution. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent. H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0105.V01 - Mavis Tire Supply, LLC\26-07-08 Review #4.docx
File revisions (1)
- Sep 29, 2026
0312afdd4209184,694 bytes