Supporting Documentation · Aug 12, 2026
PB 26 04 Orange Prospect LLC Draft Resolution
30c16974ff2e77d866a0ce2f6073fa2efa572977f4c274a8bdd7ffb4d35a95a1Indexed text · page 12
Show all pagesand landscaping. extension of time for replacement tree planting pursuant to Section 28-8 of the Township’s Tree Protection, Removal and Replacement Ordinance. NOW THEREFORE be it resolved by the Planning Board of the Township of West Orange that the Applicant’s Application (PB-26-04) for Amended Preliminary and Final Major Site Plan approval with “c” variances, waivers, a Soil Movement Permit, a Stormwater Management Permit, a Tree Removal and Replacement Permit, and an extension of time for replacement tree planting to June 24, 2027 pursuant to Section 28-8 of the Township’s Tree Protection, Removal and Replacement Ordinance is hereby granted subject to the below enumerated conditions of approval. AND IT IS FURTHER RESOLVED that the above approval is subject to the following terms and conditions: 1. The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations and directives, including without limitation, obtaining all applicable local, state and federal approvals and/or permits. Without limitation of the foregoing, prior to the signing of the approved site plans, and prior to the commencement of any land disturbance or construction but excluding interior renovations, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental approvals. 2. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those municipal
File revisions (1)
- Sep 29, 2026
30c16974ff2e302,972 bytes