Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 12, 2026

A 3 525 Northfield Avenue West Orange NJ Planning Board Exhibits 4 15 2016 prepared by Jarmel

Preserved file SHA-25609f7c9f99fc21612506640e5025e8796f126065cf87c1d2a4d38b53b758c81ee

Indexed text · page 4

Show all pages
Page 4

Ground 0' - 0" Level 2 20' - 0" Level 3 30' - 0" Level 4 40' - 0" Roof 50' - 0" AVERAGE GRADE ELEV. @ 393.54' 18' - 0" 28' - 0" 38' - 0" 48' - 0" DARK GRAY HARDIE BOARD PANELS WITH 1/2" REVEALS TAN COLORED HARDIE BOARD PANELS WITH 1/2" REVEALS CEMENTOUS TRIM AT DECORATIVE BUILDING TOP CORNICE AND TOP FLOOR BANDING TAN COLORED HARDIE BOARD PANELS WITH 1/2" REVEALS DARK GRAY HARDIE BOARD PANELS WITH 1/2" REVEALS File Path: Drawing Number: Drawing Name: Project: Project Number: Drawn By: Scale: Approved By: KizelJarmelARCHITECTS AND ENGINEERS INC. 42 OKNER PARKWAY LIVINGSTON, NEW JERSEY 07039 TEL: 973-994-9669 FAX:973-994-4069 www.jarmelkizel.com Architecture Engineering Interior Design Implementation Services AS NOTED PRINCIPALS MATTHEW B. JARMEL, AIA, MBA RICHARD JARMEL, PE IRWIN H. KIZEL, AIA, PP ARCHITECTS & ENGINEERS ARMEN B. BOHOSSIAN, PE JEREMY D. BOYER, AIA ANDRZEJ B. BRZOZOWSKI, PE SHANNON CROWNOVER, PE GERARD P. GESARIO, PE JONATHAN KUYBIDA, AIA KAROLINA PODKANOWICZ, AIA CHERYL SCHWEIKER, AIA STEVEN J. VAZ, PE Initial Date: DESIGN PROFESSIONAL OF RECORD OF H:\Drawings\Gomes Group Pedro\GOMESGR24-223 - 525 Northfield Ave West OrangeNJ\Schematic Design\New Building Design\525 Northfield - West Orange NJ Updated.rvt 4/15/2026 2:37:50 PM EX-103 BUILDING ELEVATION - REAR MIXED-USE DEVELOPMENT 525 NORTHFIELD AVENUE WEST ORANGE, NEW JERSEY 07052 GOMESGR24-233 FAA Issue Date MBJ MBJ ISSUE NO. DATE DESCRIPTION INT 1 BUILDING ELEVATION - REAR SCALE: 1/16" = 1' - 0" MATTHEW B. JARMEL, AIA, MBA NJ LIC A10-12787 1 MBJEXHIBIT04/15/26

File revisions (1)