AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org 5.12 Prior to commencing construction activities, soil erosion and sediment control measures must be in place and maintain until the disturbed ground is permanently stabilized; Addressed. The Applicant has provided narrative acknowledging this. The Applicant shall provide testimony of same. 5.13 A note should be added to the plans that all disturbed areas are to be restored, topsoiled and seeded; Addressed. 5.14 A Certification stating that the garage improvements were constructed according to the design is to be submitted by the Applicant’s professional; and Not Addressed. The Applicant shall provide testimony acknowledging the requirement of Certification that the garage improvements were constructed according the design submitted by the Applicant’s professional. 5.15 We recommend an “As-Built Topographic Plan” be submitted prior to the issuance of a certificate of occupancy; Not Addressed. The Applicant shall provide testimony acknowledging the submission of an “As-Built Topographic Plan”. VI. PERMITS 6.1 Should the Board approve this application: 6.1.1 Certification from Hudson-Essex-Passaic Soil Conservation District will be required if more than 5,000 SF 6.1.2 Soil removal permit will be required since more than 300 CY of soil will need to be moved. 6.1.3. A Street opening permit is required for any work within the ROW. 6.1.4 A tree removal application and permit will be required from the Township forester if any trees need to be removed. ZC/jrm

File revisions (1)