Supporting Documentation · Sep 17, 2026
13 Porter Rd Application package rcd 6 2 2026
b4fb2ab8971ca51dca8b803c89b071e202c26a8d53966cbdd2771199000a4563Indexed text
ARCHITECT. THE REPRODUCTION OF THIS DRAWING FOR THE MECH. PURPOSE OF COPYING THIS WORK HALLWAY OR REVISING SAID DRAWING SHALL BE CONSIDERED A VIOLATION OF BOTH THE PROFESSIONAL CODE OF
ETHICS AND A THEFT OF COMPANY ASSETS, BOTH OF WHICH SHALL BE PROSECUTED TO THE FULLEST GARAGE EXTENT OF THE LAW AND CURRENT STATUTES. 28'-11" 2'-8 1/2"
2'-8 1/2" Consultant: Aaron Gonzales, PhD 5 REMOVE EXIST. CLOSET WALL SITTING DN CRAWL SPACE FINISH BASEMENT REMOVE EXIST. LIVING ROOM CLOSET DOOR.
REPAIR W/ STUD FRAME, 1/2" GYP. BD. PAINTED. 12'-10" BEDROOM UP REV. # DN 3'-6" 8'-2" 3'-7" 4
3'-6" 8'-2" 3'-7" 4 15'-3" 14'-0 1/2" 25'-1" N N BASEMENT -DEMO FIRST FLOOR - DEMO 1 2 1/4" = 1'-0" 1/4" = 1'-0" STRUCTURAL NOTE: GENERAL DEMOLITION NOTES: WEST ORANGE , NJ 07072 1. DO ALL NECESSARY CUTTING, BLOCKING, SHORING AND TEMPORARY 1. THE DEMOLITION WORK SHOWN ON
1. DO ALL NECESSARY CUTTING, BLOCKING, SHORING AND TEMPORARY 1. THE DEMOLITION WORK SHOWN ON THIS PLAN IS INTENDED TO BE A SUPPORT OF ALL EXSITING FLOOR JOISTS, CEILING JOISTS AND ROOF GENERAL OVERVIEW OF MAJOR DEMOLITION WORK REQUIRED AND IS NOT A CONSTRUCTION AS REQUIRED, PRIOR TO THE REMOVAL OF ANY LOAD- COMPLETE AND EXCLUSIVE REPRESENTATION OF ALL DEMOLITION WORK BEARING WALLS OR BEAMS. NEEDED FOR EXECUTION OF THE PROJECT. CONTRACTORS MUST VISIT AND REFER TO THE FULL SET OF CONSTRUCTION DOCUMENTS FOR ALL ITEMS WHICH MUST BE REMOVED AND/OR RELOCATED AS PART OF THE WORK. BLOCK 175.24, LOT 3 2. ALL EXISTING EQUIMENT TO REMAIN SHALL BE PROTECTED DURING
2. ALL EXISTING EQUIMENT TO REMAIN SHALL BE PROTECTED DURING RHODE RESIDENCE 3 DEMOLITION AND CONSTRUCTION WORK. ANY DAMAGES WHICH MAY OCCUR TO EXISTING FINISHES, EQUIPMENT, OR BUILDING STRUCTURE SHALL BE PROPOSED RESIDENTIAL ADDITION 13 PORTER ROAD REPAIRED OR REPLACED AT THE CONTRACTORS EXPENSE. 3. ANY CUTS AND PENETRATIONS IN EXISTING WORK REQUIRED TO
3. ANY CUTS AND PENETRATIONS IN EXISTING WORK REQUIRED TO ACCOMPLISH NEW WORK SHALL BE KEPT TO AN ABSOLUTE MINIMUM AND SHALL BE DONE NEATLY AND WITHOUT DISTURBANCE TO ADJACENT WORK TO REMAIN. 4. REMOVE AND DISCARD ALL DEMOLISHED ITEMS FROM THE PREMISES AND DISPOSE OF SUCH ITEMS LEGALLY. 5. DO NOT SCALE DRAWINGS. 6. CONTRACTOR SHALL VISIT SITE AND VERIFY ALL EXISTING WORK DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL
IONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO ARCHITECT ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY COMPLETION OF WORK. 7. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY WORK. 8. REMOVE AND ABANDON ANY/OR UNNECESSRY PIPING DISCOVERED DURING 5/19/2026 10:45:22 AM DEMOLITION. THERE SHALL BE NO DEAD-ENDS GREATER THAN 24 INCHES IN ANY PIPING SYSTEM. 9. DURING DEMOLITION ANY DAMAGES DISCOVERED IN EXISTING PIPING TO 2
G PIPING TO 2 REMAIN SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND/OR ARCHITECT. 10. ALL EXISTING PIPING AND APPURTENANCES TO REMAIN SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION. ANY DAMAGES INCURRED SHALL BE REPAIRED OR REPLACED AT NO COST BY THE CONTRACTOR. 11. REMOVE RUBBISH FROM PREMISES AND SITE AT THE END OF EACH WORK DAY AS DIRECTED AND DISPOSE OF LEGALLY AND ALL AREAS ARE TO BE LEFT BROOM SWEPT. 12. CONTRACTOR IS RESPONSIBLE FOR VERIFYING
File revisions (1)
- Sep 29, 2026
b4fb2ab8971c19,301,938 bytes