Supporting Documentation · Sep 17, 2026
M_ZB 26 02_13 Porter Road Memo1 rcd 6 26 2026
203e24d7dd99a3a53ab58af8ded2a02f038a66a9ba04f85610749212cbccba4fIndexed text · page 4
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org This is below the 400 SF threshold for a Minor Development, as defined in Chapter 25-29 of the Township Code. The increase in impervious coverage is considered de- minimis and is not subject to additional stormwater control measures. 5.10 Prior to commencing construction activities, soil erosion and sediment control measures must be in place and maintained until the disturbed ground is permanently stabilized; 5.11 A note should be added to the plans that all disturbed areas are to be restored, topsoiled and seeded; 5.12 A Certification stating that the proposed improvements were constructed according to the design is to be submitted by the Applicant’s professional; and 5.13 An “As-Built Topographic Plan” shall be submitted once construction is completed. VI. PERMITS 6.1 Should the Board approve this application: 6.1.1 Certification from Hudson-Essex-Passaic Soil Conservation District will be required if more than 5,000 SF 6.1.2 Soil removal permit will be required if more than 300 CY of soil will need to be moved 6.1.3. A Street opening permit is required for any work within the Township’s Right of Way (ROW). 6.1.4 A tree removal application and permit will be required from the Township Forester if any trees are to be removed. ZC/jrm
File revisions (1)
- Sep 29, 2026
203e24d7dd99579,761 bytes