Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 9, 2026

Traffic Impact Study revised August 24 2026 4896 9729 06992

Preserved file SHA-256de554b0df2e14617cd914e88979c89181d8e7733b68edf92de774fd78ddc3170

Indexed text · page 28

Show all pages
Page 28

2918 25-03616 No Build - PM 10: Northfield Avenue & Sheridan Avenue SQB Synchro 12 Report 10/17/2025 Lanes, Volumes, Timings Lane Group EBL EBT WBT WBR SBL SBR Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 2.6 3.2 2.7 24.1 LOS A A A C Approach Delay (s/veh) 3.2 2.7 24.1 Approach LOS A A C Queue Length 50th (ft) 4 80 46 16 Queue Length 95th (ft) 11 110 66 53 Internal Link Dist (ft) 577 121 322 Turn Bay Length (ft) 50 Base Capacity (vph) 559 3448 3568 732 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.08 0.35 0.23 0.09 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 55 (61%), Referenced to phase 2:EBTL and 6:WBT, Start of Yellow Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.35 Intersection Signal Delay (s/veh): 3.6 Intersection LOS: A Intersection Capacity Utilization 48.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 10: Northfield Avenue & Sheridan Avenue

File revisions (1)