Supporting Documentation · Sep 17, 2026
13 Porter Site Plan Updated rcd 9 1 2026
a7ea227b5d4555256863aac631ac21a39f36c64ef9e9ecd06a4ffba16a6cc40dIndexed text · page 9
Show all pagesEXPOSURE PLYWOOD SHEATHING PROPOSED RESIDENTIAL ADDITION (TYP.) 13 PORTER ROAD 5" GUTTERS & LEADERS DRAIN AWAY FROM HOUSE 5" CONC. SLAB W/ 6x6x6 WWF. 2-#4 REBAR SPACED EQUALLY FIN. FLR. SELECTED
FIN. FLR. SELECTED BY OWNER BASEMENT 0" -8'-3" FIRST FLOOR 1'-0" 0" 8/31/2026 11:57:50 AM CONTINUOUS 24" x 12" EXISTING BASEMENT (NO CHANGES)
CONTINUOUS 24" x 12" EXISTING BASEMENT (NO CHANGES) POURED CONC. FOOTING 2 2'-0" BASEMENT -8'-3" ELEVATIONS PAGE 2, WALL SECTION RIGHT ELEVATION TYPICAL WALL SECTION 2 3 1/4" = 1'-0" 3/4" = 1'-0"
3/4" = 1'-0" Drawn By: AJG Checked By: FC3 A-201 26-052 A-201 1 As indicated 26-052 08-31-2026 © F E D C B A
File revisions (1)
- Sep 29, 2026
a7ea227b5d456,398,369 bytes