Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 17, 2026

M_ZB 26 02_13 Porter Road Memo2

Preserved file SHA-2562c96fced4f3d4242e91958fc79e146ca9e1808bcd56aaecbc2458ebe8e4340b4

Indexed text · page 6

Show all pages
Page 6

AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org to be provided. The Applicant’s professional shall provide confirmation of the provided permeability rate and depth to SHGW prior to construction. 5.15 The Applicant’s professional is responsible for ensuring the effectiveness of proposed stormwater management system and provide sufficient regular oversight during its construction; 5.16 A Certification stating that the stormwater management system was constructed according to the design is to be submitted by the Applicant’s professional; 5.17 Please provide the stormwater maintenance manual:  Name and phone number of the person(s) responsible for maintenance  Map to scale showing the as-built location of the stormwater management system  Maintenance for underground retention system should include at least annual inspection for damage, subsidence, and cleaning  Maintenance for components that may cause the zipper drain and underground chambers to be inoperable;  Replacement of damaged components;  Additional maintenance guidance is available at NJDEP New Jersey Department of Environmental Protection and https://www.nj.gov/dep/stormwater/ 5.18 The Applicant/Owner will be responsible for ensuring that the Cultec Recharge System is regularly and effectively maintained without negative impacts to neighboring properties; VI. PERMITS 6.1 Should the Board approve this application: 6.1.1 Certification from Hudson-Essex-Passaic Soil Conservation District will be required if more than 5,000 SF 6.1.2 Soil removal permit will be required if more than 300 CY of soil will need to be moved 6.1.3. A Street opening permit is required for any work within the Township’s Right of Way (ROW). 6.1.4 A tree removal application and permit will be required from the Township Forester if any trees are to be removed. ZC/jrm

File revisions (1)