Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 4, 2026

1250703StormWaterManagementReport

Preserved file SHA-2564e86752994919d2ad538759355ec7513a754f9a434014a4961715ee00ebacd89

Indexed text · page 186

Show all pages
Page 186

27 Fairway Drive, West Orange 1250703-6.03 Water Quality Storm Water Quality Rainfall=1.25", P2=3.47" Prepared by Casey & Keller, Inc HydroCAD® 10.20-9a s/n 03272 © 2026 HydroCAD Software Solutions LLC Printed 10/21/2026 Page 82 Summary for Link 10L: Proposed Inflow Area = Inflow = Primary = 0.190 ac, 27.66% Impervious, Inflow Depth = 0.07" for Water Quality event 0.01 cfs @ 1.00 hrs, Volume= 0.001 af 0.01 cfs @ 1.00 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 1.00 hrs Link 10L: Proposed Hydrograph 0.01 0.009 0.009 0.008 0.01 cfs 0.01 cfs Inflow Primary Inflow Area=0.190 ac Flow (cfs) 0.008 0.007 0.007 0.006 0.006 0.005 0.005 0.004 0.004 0.003 0.003 0.002 0.002 0.001 0.001 0.000 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) 185

File revisions (1)