1250703StormWaterManagementReport

Preserved file SHA-2564e86752994919d2ad538759355ec7513a754f9a434014a4961715ee00ebacd89

Indexed text · page 3

Show all pages
Page 3

STORMWATER MANAGEMENT Stormwater management is a critical component of the development process, requiring careful coordination between the site designer’s objectives, municipal ordinances, and the regulatory standards established by the New Jersey Department of Environmental Protection (see Hydrology section below). While best practices emphasize minimizing the use of structural stormwater controls, practical site constraints typically necessitate a balanced approach that incorporates both non-structural and structural measures. The existing site is already developed, with building coverage and paved surfaces. In accordance with the Township of West Orange requires that stormwater analyses be performed for the 2-year, 10-year, 25-year, and 100-year storm events. The reduction factors applied to the 2-, 10-, and 100-year storm events are 50%, 25%, and 20%, respectively. Although this project does not meet the requirements for a major development, these reductions were applied to further enhance the site performance. The “Natural Resources Conservation Service Method,” as outlined in Technical Release 55 (TR-55), was utilized to size and route stormwater through the proposed perforated pipe system. Stormwater hydrographs for both existing and proposed site conditions have been prepared and are included in this report to demonstrate compliance. Site Discharge The following table shows that the site would produce post-developed runoff rates and volumes that are lower than the site’s existing rates of runoff. The existing and proposed peak runoff rates (Q) from the site are summarized as follows: Summary Peak Detention Flow Lot 6.01 After Frequency 2 - 2020 10 - 2020 25 - 2020 100 - 2020 2 - 2050 10 - 2050 25 - 2050 100 - 2050 Disturbed Q 0.10 0.19 0.25 0.37 0.13 0.23 0.32 0.49 Reduction x x x x x x x x 0.50 0.25 0.00 0.20 0.50 0.25 0.00 0.20 = = = = = = = = Reduction Q 0.05 0.14 0.25 0.30 0.07 0.17 0.32 0.39 Q Non Disturb + + + + + + + + 0.02 0.04 0.05 0.08 0.03 0.05 0.07 0.11 Summary Peak Detention Flow Lot 6.03 After Frequency 2 - 2020 10 - 2020 25 - 2020 100 - 2020 2 - 2050 10 - 2050 25 - 2050 100 -

Page 3

Non Disturb + + + + + + + + 0.02 0.04 0.05 0.08 0.03 0.05 0.07 0.11 Summary Peak Detention Flow Lot 6.03 After Frequency 2 - 2020 10 - 2020 25 - 2020 100 - 2020 2 - 2050 10 - 2050 25 - 2050 100 - 2050 Disturbed Q 0.04 0.09 0.13 0.20 0.05 0.12 0.17 0.27 Reduction x x x x x x x x 0.50 0.25 0.00 0.20 0.50 0.25 0.00 0.20 = = = = = = = = Reduction Q 0.02 0.07 0.13 0.16 0.03 0.09 0.17 0.22 = = = = = = = = Q Non Disturb + + + + + + + + 0.05 0.12 0.18 0.28 0.08 0.16 0.24 0.38 = = = = = = = = Q Total Q Allowable Proposed 0.07 0.18 0.30 0.38 0.10 0.22 0.39 0.50 0.05 0.12 0.18 0.28 0.08 0.16 0.23 0.38 Q Total Q Allowable Proposed 0.07 0.19 0.31 0.44 0.11 0.25 0.41 0.60 0.07 0.16 0.23 0.36 0.10 0.21 0.30 0.49 2

File revisions (1)