Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 4, 2026

1250703StormWaterManagementReport

Preserved file SHA-2564e86752994919d2ad538759355ec7513a754f9a434014a4961715ee00ebacd89

Indexed text · page 4

Show all pages
Page 4

The Site Discharge table shows that the proposed project would result in post-developed runoff rates that are less than or equal to the site’s existing runoff rates. The hydrographs for the 2-year, 10-year, 25-year, and 100-year storms do not exceed at any time the predeveloped hydrographs for the same events as required per West Orange’s ordinance. Based upon this analysis, it is our professional opinion that the proposed storm water management system would enhance the existing downstream conveyance systems and meet the required Municipal standards. Calculations supporting these findings constitute the remainder of this report. 3

File revisions (1)