Supporting Documentation · Oct 29, 2026
42726 Emails between Dynamic Engineering and Essex County Engineering Department Re no requirement for dedication of land along Prospect Ave
7459a1f32fc5f13cf5325943a4c40e5aed319804ad246802d35eab0813f1dd54Indexed text · page 16
Show all pagesCounty Policy/Dedication, Reservation, Easement Based upon the criteria and standards established by the Essex County Planning Board for R.O.W. widths, the Planning Board will request dedications, reservations and/or easements. Each road or road segment will be delineated in terms of a dedication or reservation or easement requirement. Exceptions to the established request should be minimal but will be judged on a case by case basis and through the established appeal process. It is the Board's policy that in areas where existing buildings are closer to the roadway than the proposed future right- of-way line, the determination of requirements for dedication or reservation shall be decided on a case by case basis. The intent is that where the majority of the property along a significant length of said roadway has buildings closer to the roadway than the proposed right-of-way, the requirement of dedication or reservation would be waived; otherwise it would be required. The purpose of reservation i. and dedication is for the orderly improvement of the County roadway system. In areas where roadway widening is not anticipated in the near future, only a reservation of right-of-way will be required. Where roadway widening is desirable in the near future, a dedication of right-of-way will be required.
File revisions (1)
- Nov 3, 2026
7459a1f32fc57,870,901 bytes