42726 Emails between Dynamic Engineering and Essex County Engineering Department Re no requirement for dedication of land along Prospect Ave
7459a1f32fc5f13cf5325943a4c40e5aed319804ad246802d35eab0813f1dd54Indexed text · page 21
Show all pagesB. Highway Network Assessment Focusing Upon the Return’of Existing County Roads to State and Municipal Systems. There are existing County roads or portions thereof that do not enhance the County Highway Network and therefore the return thereof to the proper jurisdictions should be given consideration. It is the prerogative of the County to abandon roads or turn them over to municipalities as it sees fit. However, it will be the policy of this Board not to do so without negotiations with the appropriate jurisdictions. This Board will make every attempt to maintain good working relationships, maximum communications, and high levels of understanding as far as reasonably possible and as long as the general health, safety, and welfare of the public is not compromised. Where economically feasible, the County will not attempt to return roads until it can put them into a better state of repair. The County will not do so until it has local assurances that jurisdiction will receive and maintain the repaired road. A 5-year schedule for improving these roads will be developed and provided for the encouragement of the County Engineer's priority consideration. All considerations must be reasonable and economically feasible particularly where expenditures of large sums of county dollars will be involved. Until the proper conditions come together, the County Planning Board will not initiate steps to return any of the following roads:- 1. Fairfield - Brook Street Hollywood Avenue Pier Lane 2. Livingston Hobart Gap Road
File revisions (1)
- Nov 3, 2026
7459a1f32fc57,870,901 bytes