Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 29, 2026

42726 Emails between Dynamic Engineering and Essex County Engineering Department Re no requirement for dedication of land along Prospect Ave

Preserved file SHA-2567459a1f32fc5f13cf5325943a4c40e5aed319804ad246802d35eab0813f1dd54

Indexed text · page 35

Show all pages
Page 35

Essex County Highway Master Plan No. Code County Road Municipalities 005 4 Bloomfield Avenue Belleville, Newark E . Bloomfield, Glen Ridge Montclair, Verona Right of Way: 100° Entire qeeaidweli, Wy. Calawey: Requirements: None Notes: Limits Right of Way: Requirements: Notes: Limits Right of Way: Requirements: Notes; TIP Activity 1.) Widening through Glen Ridge. Under design; construction to begin 1986. 2.) Signal: Improvement and channelization. Under design; con- struction to begin 1986. Operating Budget Activity Capital Budget Activity -Sidewalk and Curb Repair (1984) -Thick overlay (1984) Other: Condition of Road:

File revisions (1)