14 the proposed improvements would capture the runoff and slow its discharge. He also explained that the existing drainage pipes along Eagle Rock Avenue were designed before current stormwater regulations and that the project would provide an opportunity to upgrade those pipes to meet today's standards. - Mr. Weisleder questioned whether the proposed drainage improvements would affect only a small portion of Eagle Rock Avenue rather than improving the entire roadway. Mr. Cote confirmed that the improvements would be limited to the portion of Eagle Rock Avenue within the project's work area. - Mr. Weisleder asked what specific existing problem justified the drainage improvements and whether there was data or a study showing the need for the work. Mr. Cote explained that the existing drainage system is substandard under current stormwater regulations because its conveyance structures were not designed to accommodate the increased flow rates now required for current storm events. - Mr. Weisleder asked how much of Eagle Rock Avenue would be improved. Mr. Cote stated that the improvements would extend from Laurel Avenue at the western end to the eastern end of the Crestmont Country Club property, within the limits of the applicant's work. - Mr. Weisleder asked whether the retaining walls, grading, and stormwater improvements would still be necessary if Crestmont Country Club were not adding the additional parking spaces. Mr. Cote explained that the retaining walls were associated with maintaining appropriate grades for the parking lot, while the stormwater detention systems would also be required because of the proposed widening of Eagle Rock Avenue and the additional turning lanes. - Mr. Weisleder asked whether the stormwater improvements for the parking lot and the roadway could be completed separately. Mr. Cote explained that the stormwater management required for the roadway improvements had been combined with the stormwater management for the parking lot into one system. He acknowledged that different components could be designed independently but stated that the current application addressed the improvements together. - Mr. Weisleder asked whether the widening and regrading of Eagle Rock Avenue were primarily being undertaken because of the new exit and traffic signal or whether the improvements would have been required regardless. Mr. Cote stated that the

Page 14

and regrading of Eagle Rock Avenue were primarily being undertaken because of the new exit and traffic signal or whether the improvements would have been required regardless. Mr. Cote stated that the work had been requested in connection with the installation of the traffic signal associated with the settlement agreement. He also stated that, based on discussions involving the applicant's traffic engineer, he understood that the County supported the project. - Mr. Weisleder asked whether the applicant had considered alternative parking lot layouts that could provide additional spaces without requiring as much grading, retaining wall construction, tree removal, or work along Eagle Rock Avenue. Mr. Cote stated that the applicant had considered the design and developed the proposed layout to minimize impacts. - Mr. Weisleder asked why the applicant could not relocate or redesign the driveway and parking lot differently to address visibility and alignment concerns without the other proposed site changes. Mr. Cote reiterated that alternative designs could result in greater impervious surface, additional tree removal, and increased disturbance to steep slopes. He stated that the proposed design was the most suitable option developed to minimize those impacts. - Mr. Weisleder asked whether Crestmont Country Club would become responsible for assisting the County with stormwater management because of the additional runoff associated with the project. Mr. Cote stated that the County would benefit from the

File revisions (1)