15 proposed improvements because the applicant would be upgrading existing substandard drainage pipes and roadway drainage structures. - Mr. Weisleder asked whether the project would affect West Orange's stormwater containment or control. Mr. Cote explained that the proposed stormwater design complies with applicable requirements for reducing post-development discharge rates and would improve downstream receiving conditions. - Mr. Justin Goldsman of Moran Road asked Mr. Cote about the capacity of a standard bioretention basin to absorb or prevent stormwater runoff. Mr. Cote explained that the bioretention component of the basin is primarily intended for water quality rather than water quantity. - Mr. Goldsman asked whether the bioretention basin also plays a role in reducing runoff and requested an estimate of its capacity. Mr. Cote explained that each basin is designed differently and that the proposed system was designed to meet stormwater discharge requirements. He referenced reducing the 2-year storm discharge rate to 50%, the 10-year storm discharge rate to 75%, and the 100-year storm discharge rate to 80% of the applicable existing rates. - Mr. Goldsman asked whether Mr. Cote could estimate how many trees would provide the equivalent stormwater management capacity of the proposed bioretention basins. Mr. Cote stated that he had no way to make that comparison and reiterated that the project had been designed to meet the required discharge reductions for both current storm conditions and projected future storm conditions for the year 2100. - Mr. Goldsman asked whether questions concerning wildlife should be directed to a subsequent witness. Mr. Cote stated that he was not certain how those questions would be addressed during the application. - Mr. Panullo referred to Ms. Bennett's earlier questions concerning the stormwater system and asked Mr. Cote to clarify his statement that certain stormwater conditions would remain the same as they are today. Mr. Cote explained that his earlier statement concerned what would happen if a storm exceeded the capacity of the proposed detention basins. He stated that excess stormwater would flow into the same drainage systems and locations along Eagle Rock Avenue that currently receive runoff. He emphasized that the project would not redirect stormwater to different watersheds or other areas of the Township. - Mr.

Page 15

systems and locations along Eagle Rock Avenue that currently receive runoff. He emphasized that the project would not redirect stormwater to different watersheds or other areas of the Township. - Mr. Panullo asked whether Mr. Cote could address the widths of the proposed driveway, roadway, and sidewalks as part of his civil engineering testimony. Mr. Cote stated that the proposed country club driveway would be 24 feet wide and would function as an exit- only driveway, with two 12-foot lanes leading to the proposed traffic signal at Eagle Rock Avenue. He explained that the roadway lane widths had been addressed by the traffic engineer and would comply with County requirements. - Mr. Panullo asked where the widening of Eagle Rock Avenue would occur. Mr. Cote explained that the widening would take place entirely along the Crestmont Country Club side of Eagle Rock Avenue, using the frontage of the country club property to accommodate the additional roadway width. - Mr. Panullo asked whether the widening was intended to provide one additional lane. Mr. Cote explained that the widening would accommodate a center left-turn lane serving Oval Road at the proposed signalized intersection. - Mr. Panullo asked Mr. Cote to confirm that the land necessary to widen Eagle Rock Avenue along the Crestmont Country Club frontage would come from the country club property. Mr. Cote confirmed that this was correct. - Mr. Panullo asked Mr. Cote how wide the proposed additional lane on Eagle Rock Avenue would be. Mr. Cote stated that the lane would be approximately 11 feet wide

File revisions (1)