18 - Mr. Panullo asked whether pedestrian access along the driveway was included in the current plans, and Mr. Cote confirmed that it was not. - Mr. Panullo asked whether the proposed design included any measures to capture or manage stormwater at the upper parking lot before it flowed downhill toward the detention basins. Mr. Cote explained that the upper parking lot would include porous pavement as a water quality measure. He stated that porous pavement is an allowable stormwater treatment method under current standards and would help achieve the project's overall water quality goals. - Mr. Panullo asked whether water would be contained at the upper parking lot. Mr. Cote clarified that the porous pavement would allow stormwater to pass through and be filtered rather than function as the primary detention system. He explained that the detention basins would be located farther downhill. - Mr. Panullo asked whether the proposed roadway widening, retaining walls, and sidewalk would affect the time of concentration or velocity of stormwater runoff from the site. Mr. Cote explained that the existing and proposed times of concentration and the manner in which stormwater moves across the site were included in the stormwater calculations. He stated that those factors were considered in designing the proposed stormwater management system to comply with the Township's stormwater management requirements. - Mr. Panullo asked whether the applicant was representing that the proposed design complied with the Township's stormwater ordinance. Mr. Cote confirmed that it did. - Mr. Panullo also asked whether the flow rates were included in the compliance calculations, and Mr. Cote confirmed that the previously stated flow rates complied with the applicable requirements. PRESENTATION - The professional planner, Mr. Sean Moronski, entered on the record and was sworn under oath. He testified to the following: - Mr. Schkolnick asked Mr. Moronski to address the proposed site improvements and the requested variances. Mr. Moronski confirmed that he had reviewed the plans, application materials, professional reports, review letters, and the site. He also stated that he had heard the testimony from the current and two previous hearings, including questions from the Board's professionals, Board members, and the public. - Mr. Moronski explained that his testimony would address each

Page 18

testimony from the current and two previous hearings, including questions from the Board's professionals, Board members, and the public. - Mr. Moronski explained that his testimony would address each requested C or bulk variance and demonstrate how the application satisfied the standards for relief under the Municipal Land Use Law. - Mr. Moronski first addressed Section 25-12.1.B, which requires a minimum distance of 5 feet from the parking area curb to fencing, screening, or a structure. He stated that setbacks of less than 5 feet already existed in various locations and that the applicant proposed a 3-foot setback. - Mr. Moronski stated that the applicant was requesting relief under the C2 variance criteria, where the overall benefits of the application outweigh the concerns associated with the deviation. - He explained that the reduced setback would allow the parking area to reconnect with the proposed driveway grading and retaining wall. - Mr. Moronski stated that the deviation would affect six parking spaces and represented a very minor impact. He explained that the reduced setback would not affect neighboring buildings or uses and would not create the types of concerns typically associated with parking areas near neighboring properties, such as vehicle lights or activity.

File revisions (1)