21 and the enhanced aesthetics along the Eagle Rock Avenue frontage would provide both on-site and public benefits from an aesthetic perspective. - Mr. Moronski next addressed Purpose M, which encourages coordination of public and private procedures and activities shaping land development to lessen development costs and promote more efficient use of land. He stated that the applicant had worked with Essex County to provide land along the Eagle Rock Avenue frontage for roadway improvements. - Mr. Moronski explained that the proposed driveway realignment would create an intersection and eliminate a driveway that otherwise would not align with the intersection across Eagle Rock Avenue. He stated that this represented an overall public benefit and emphasized that applications must be evaluated not only for the benefits to the applicant but also for the benefits to the public. - Mr. Moronski addressed the negative criteria for the requested variances, stating that there would be no substantial detriment to the public good. He explained that every application may have some impact, but the question is whether that impact rises to the level of being substantial and, if so, whether it is being addressed. - Mr. Moronski stated that Essex County was favorable toward the proposed intersection improvements and driveway relocation, which had been suggested by the County traffic engineer years earlier. He identified the widening of Eagle Rock Avenue, the proposed left-turn lane onto Oval Road, the lengthening of the left-turn lane onto Laurel Avenue, coordination with the Laurel Avenue traffic signal, and improved sight distances as benefits of the application. - Mr. Moronski stated that the project would improve stormwater management and benefit the surrounding area. He explained that the existing driveway drains water onto Eagle Rock Avenue and that removal of the driveway, together with the proposed drainage improvements along Eagle Rock Avenue, would help remedy that condition. - Mr. Moronski also addressed the sidewalk recommended by the Planning Board, which would extend along Eagle Rock Avenue from Laurel Avenue to the end of the Crestmont property line, but not onto any other property. He stated that the sidewalk would enhance the potential for pedestrian activity. - Mr. Moronski emphasized that the proposed site improvements would not increase the intensity of the

Page 21

y other property. He stated that the sidewalk would enhance the potential for pedestrian activity. - Mr. Moronski emphasized that the proposed site improvements would not increase the intensity of the country club's use. He stated that no new buildings were proposed and that the application was intended to improve the existing parking situation rather than increase the intensity of activity on the property. - Mr. Moronski stated that the tree replacement plan would contribute to the aesthetic improvements and was documented in the submitted plans. He also stated that no NJDEP permits were required for the project. - Mr. Moronski referred to Mr. Cote's testimony that the proposed driveway grade of approximately 8% was acceptable under winter conditions. He noted that other existing areas of the site, including the area near Laurel Avenue, have steeper grades. - Mr. Moronski stated that the stormwater detention system was required in connection with the Eagle Rock Avenue improvements. He also confirmed that the applicant had agreed to maintain the proposed sidewalk along Eagle Rock Avenue as a condition of approval and that the sidewalk had already been accounted for in the retaining wall design. - Mr. Moronski stated that the proposed impervious coverage included approximately 12,000 square feet on-site, or roughly one-quarter acre, and another approximately one- quarter acre off-site. - Mr. Moronski explained that the project area was approximately 3.95 acres within the overall 146-acre Crestmont Country Club property. He stated that the improvements were

File revisions (1)