Supporting Documentation · Nov 4, 2026
9 2 26 WO PB Draft Minutes
e517e0133e501772133e3ec02fd3a94ed8399b86900e5b5caa6858d51f060903Indexed text · page 7
Show all pages7 PRESENTATION - Mr. Richard Schkolnick, Esq., appearing on behalf of the applicant, explained that the application is for site plan approval with several C variances. - He stated that the property is located in the R2 zone, the existing use is permitted, and no new buildings are proposed. - The application includes 32 new parking spaces and a new exit for Crestmont Country Club that would align with Oval Road, creating a four-way intersection along Eagle Rock Avenue. - Mr. Schkolnick stated that the proposed improvements include widening Eagle Rock Avenue, new grading, stormwater management, significant landscaping improvements, and a traffic signal intended to create a safer intersection. - He also confirmed that the applicant had agreed during the previous hearing to install a sidewalk along Eagle Rock Avenue and had no objections to the review letters prepared by the Board's professionals. - Mr. Schkolnick provided a recap of the previous hearings, beginning with June 3, 2026. ○ He stated that Ms. Dana Cancellaro, General Manager and Chief Operating Officer of Crestmont Country Club, testified regarding the need for additional parking for club members and the challenges associated with the existing driveway, including its slope and difficult left-hand turns. ○ She also discussed the club's desire for safety improvements and the potential for eminent domain, explaining that the proposal represented a reasonable, practical, and cooperative approach to addressing complex issues involving the Township and potential condemnation of the club's property. ○ Mr. Schkolnick stated that the Board previously heard testimony from Mr. John Cote, P.E., the applicant's civil engineer, who presented an aerial photograph and discussed the site improvements ○ Mr. Carl Penke, the applicant's traffic expert, who addressed the geometry of the proposed four-way intersection, difficult turning movements, private investment in the traffic signal, widening of Eagle Rock Avenue, left-hand turns, crosswalks, ramps, sidewalks, and existing grading challenges. Mr. Penke also discussed previous efforts involving the County Planning Board to improve this section of Eagle Rock Avenue. ○ Mr. Schkolnick explained that the July 1, 2026 hearing included extensive cross- examination of Mr. Penke, followed by approximately 20 minutes of testimony from Mr. Cote regarding the civil engineering
. Schkolnick explained that the July 1, 2026 hearing included extensive cross- examination of Mr. Penke, followed by approximately 20 minutes of testimony from Mr. Cote regarding the civil engineering plans. ○ He stated that the current hearing would continue with cross-examination of Mr. Cote, followed by testimony from the applicant's planner as the final witness. BOARD QUESTIONS - Ms. Kapferer referred to the April 24, 2026 Artheon review letter, which included comments concerning the geotechnical report and the depth to seasonal high groundwater. She asked whether additional testing had been performed, noting a potential conflict between the seasonal high groundwater elevation and the bottom of the proposed stormwater basin. Mr. Cote explained that testing had been performed at or near both proposed basins to evaluate seasonal high groundwater conditions. He also stated that the site contained Class D soils, which do not permit adequate infiltration.
File revisions (1)
- Nov 4, 2026
e517e0133e50343,414 bytes