Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 4, 2026

9 2 26 WO PB Draft Minutes

Preserved file SHA-256e517e0133e501772133e3ec02fd3a94ed8399b86900e5b5caa6858d51f060903

Indexed text · page 8

Show all pages
Page 8

8 - Mr. Cote explained that because of the Class D soils, the proposed bioretention basins would filter stormwater through the bioretention media and then discharge the treated water through an outlet rather than infiltrating it into the ground. - Ms. Kapferer asked specifically whether the concern regarding seasonal high groundwater being higher than the bottom of the basin had been resolved. Mr. Cote stated that, to his knowledge, the issue had been resolved through the geotechnical review. He also confirmed that the applicant would address the comments and provide responses as part of the review process. PROFESSIONAL QUESTIONS - Ms. Apte asked Mr. Cote to confirm that he had received and reviewed the planning review letter dated June 3, 2026, and that the applicant agreed to comply with the comments contained in the letter. Mr. Cote confirmed that the applicant would comply. - Mr. Valesi asked Mr. Cote whether the applicant had reviewed the engineering report and agreed to comply with all comments. Mr. Cote confirmed that the applicant would comply with the report. PUBLIC QUESTIONS - Mr. Joe Panullo of Holton Lane, Essex Fells, asked whether any portion of the site, proposed modifications, or stormwater runoff was located within a Water Quality Management Plan area. Mr. Cote explained that the entire site, along with the Township, is included within the Water Quality Management Plan for purposes of public sanitary sewer service. He clarified that stormwater management is governed by applicable NJDEP and Township regulations. - Mr. Panullo asked whether the Water Quality Management Plan covered a broader area beyond the subject property. Mr. Cote confirmed that the plan was not limited to the site - Mr. Panullo also asked whether the property was located within a watershed, and Mr. Cote confirmed that it was. - Mr. Panullo asked whether any NJDEP permits were required, submitted, or anticipated for the project. Mr. Cote stated that no NJDEP permits were required because the proposed improvements would not disturb any areas under NJDEP jurisdiction. - Mr. Panullo asked about the direction of stormwater runoff from the site. Mr. Cote explained that a watershed divide runs approximately through the middle of the project. Stormwater from one portion of the site flows toward the Eagle Rock Avenue and Laurel Avenue intersection, while stormwater from the other

Page 8

divide runs approximately through the middle of the project. Stormwater from one portion of the site flows toward the Eagle Rock Avenue and Laurel Avenue intersection, while stormwater from the other portion flows east along Eagle Rock Avenue into the existing County roadway drainage system. - Mr. Panullo asked whether any stormwater would flow north across Eagle Rock Avenue toward the golf course and Pleasantdale Chateau. Mr. Cote stated that the project's stormwater flows east and west through the existing conveyance systems and does not flow north toward those properties. - Mr. Panullo asked how water flowing toward Canoe Brook and across Laurel Avenue or Eagle Rock Avenue would be handled. Mr. Cote explained that the project addresses existing sheet flow from the site, which currently drains downhill toward Eagle Rock Avenue without detention. He stated that the applicant is proposing stormwater detention facilities to control and slow the runoff. - Mr. Panullo questioned how stormwater from the elevated parking lot and country club property could flow east and west rather than north. Mr. Cote explained that the crown of Eagle Rock Avenue creates an east-west distribution of water, similar to the peak of a gabled roof, with runoff flowing in opposite directions from the high point.

File revisions (1)