Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 19, 2026

M_ZB 26 01_15 Alan Street Memo4

Preserved file SHA-256e9a5acc2118f8ae30d311aa826b694d46b46957494baa6181b46b93d9c550c84

Indexed text · page 2

Show all pages
Page 2

AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org E. Structural plans entitled, “Garage Expansion at West Orange, NJ.” Plans prepared by Yogi Engineering through consultant Seva Engineering (Sanjay N. Patel) are dated February 27, 2026. The following information was submitted on May 6, 2026 in addition to the previously provided information: F. Soil Movement Calculation and Soil Erosion and Sediment Control Plan Document, dated May 4, 2026; G. Tree Protection Plan Document, Dated April 26, 2026; H. Garage Expansion Plan, prepared by Max Grossman, last dated May 6,2026; I. Proposal Narrative; and J. Revised Variance Application The following information was submitted on July 28, 2026 in addition to the previously provided information: K. Planning Evaluation, prepared by Peter G. Steck P.P., dated July 18, 2026 L. Revised Variance Application, last dated July 19, 2026 The following information was submitted on November 4, 2026 in addition to the previously provided information: M. Site Plan, entitled “Garage Expansion Plan, 15 Alan Street, West Orange, NJ 07052”, prepared by Richard B. Vollmar P.E. of Blue Line Stone Home & Engineering, dated October 26, 2026; N. Response correspondence, prepared by Richard B. Vollmar P.E., P.P., C.M.E. of Blue Line Stone Home & Engineering, dated October 27, 2026. I. INTRODUCTION The subject site is located along the Northern side of Alan Street and located with the Township’s Residential (R-T) Zone District. The Applicant is proposing to modify the existing garage located at the north westerly corner of the property to accommodate the size of modern vehicles and family needs.

File revisions (1)