Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 19, 2026

M_ZB 26 01_15 Alan Street Memo4

Preserved file SHA-256e9a5acc2118f8ae30d311aa826b694d46b46957494baa6181b46b93d9c550c84

Indexed text · page 5

Show all pages
Page 5

AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org 5.5 Make sure to show the locations of the roof leaders and point of discharge on the ground including how these will tie into any existing pipes and provide associated pipe sizes, lengths and slopes; Addressed. The Applicant proposes to maintain the existing discharge locations of the existing garage. The Applicant should provide testimony addressing adherence to this. 5.6 Roof overhangs should be dimensioned to ensure it does not project more than 2 feet as per ordinance 25-8.2(c). Otherwise, a variance shall be required for any feature that projects more than two feet into a required yard; Partially Addressed. The Applicant’s Professional has stated testimony will be provided. 5.7 Testimony should be provided by Applicant’s professional to clarify that the location of the roof leaders on the ground will not adversely affect adjoining property owners; Addressed. A plan has been provided indicating the locations of the proposed roof leaders. Additionally, a note on the plan states, “No adjoining neighbors will be adversely affected by relocated roof leader.” 5.8 Testimony should be provided by Applicant’s professional to confirm that the garage improvements are is within the 0 to 10% slope range that allows 100% disturbance. Refer to section 25-28 of the Township’s ordinance; Partially Addressed. A topographic survey was conducted; the contour lines and elevation data have been added to the plan. A note has been included on the plan stating the proposed improvements are in accordance with slope and disturbance thresholds in Section 25-28 of the Township Ordinance. The Applicant’s Professional shall provide further testimony confirming that the proposed improvements are within the 0 to 10% slope range. 5.9 A soil erosion and sediment control plan with details needs to be provided and show the area of disturbance; Addressed. The plan provided includes soil erosion and sediment control (SESC) details. The Applicant’s Professional states that the approximate limit of disturbance is approximately 200 SF and is below the threshold for SESC permitting.

File revisions (1)