area, which is the area eight to ten feet behind the curb, we grade that flat. So it’s a walkable surface through there. That’s generally done to make sure that you have proper sight lines for people traveling along the roadway. It’s a properly maintained border area. And that’s -- that’s the standards that we follow from the Department of Transportation and Essex County. So it’s a really substantive improvement and widening project that will enhance the operational1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 45 characteristics of this section of Eagle Rock Avenue and make it safer to drive along it. So the other aspect of the safety is separating the left turns onto Oval Road from the through traffic so that any vehicle that is slowing to enter and -- and turn onto Oval Road is stored out of the through traffic and does not disrupt that through traffic flow, does not cause vehicles to have to -- to go around a stopped vehicle, and basically just creates a safety enhancement for both through vehicles that are traveling along Eagle Rock Avenue as well as those that are regularly turning onto -- to Oval Road. The Crestmont Country Club driveway will come down. It’ll have a two-lane approach, left turn lanes, and then basically a right turn lane which will allow through movement. So if there’s any guests that live up in the -- the Highlands, they’ll be able to continue across onto Oval Road. The intersection also will be fully modernized. It’ll use the current forms of detection, will be fully compliant with the -- the current regulations in the MUTCD and will include pedestrian accommodation. So all four legs of the intersection will have crosswalks, handicap ramps, and connecting sidewalks so that somebody that wants to cross Eagle Rock Avenue in this1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 46 area has a safe way to do that with pedestrian heads and pedestrian push-buttons and guidance to sidewalks and handicap ramps. So all of what the -- all of the modern conveniences and -- and bells and whistles that come with a current traffic signal are being installed at this location, as we would do in any new design. The improvements going over to sheet 2013, as I said, include continuous widening along Eagle Rock Avenue. What that does is it gives us the opportunity to extend the left
would do in any new design. The improvements going over to sheet 2013, as I said, include continuous widening along Eagle Rock Avenue. What that does is it gives us the opportunity to extend the left turn lane, which currently ends where my -- my hand is right now and adding about 200 feet of additional storage in cue. And again, that’s - - provides for safety improvement along the westbound side of Eagle Rock Avenue, storing additional vehicles that want to make the left to Laurel Avenue outside of the three lanes. So overall, the section of Eagle Rock Avenue between Laurel Avenue and, going back to the other sheet, Oval Road will be significantly enhanced, all providing a public benefit. This really is a capital improvement that just is benefitting the existing through traffic along Eagle Rock Avenue and Oval Road and -- and addressing the conditions that exist out there today. So these plans will be progressed through Essex
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 47 County. Essex County is aware of this. They -- they have had some preliminary input through the years with Mr. Lublanecki, with -- with West Essex Highlands. They have -- I know in the past, as I got to be involved, there’s been meetings in the field. So this isn’t new to anybody and I -- I don’t think these improvements really surprise anybody as being needed and the benefits that they -- that they provide. So that really sums it up. The intersection will operate at very good levels of service. It will be coordinated with the traffic signal at Laurel Avenue so that it doesn’t influence or impact the Laurel Avenue intersection. The way that’ll be done is by what’s known as GPS units. They basically are units that will sync the two signals and allow them to -- to work off of each other. The Laurel Avenue intersection will be what we call the master that basically controls the system and Oval Road will be basically a slave to -- to Laurel Avenue. It’s done quite frequently and will work -- work quite -- quite well. So that I think sums up the -- the project. Oh. I should say that there are other design issues that are beneficial. The -- the drainage along this section of Eagle Rock Avenue is -- is somewhat lacking, so there will be a full drainage system put in place. Mr.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 48 Cote’s accommodated for that on the site, so some of those drainage basins are involved with taking some of that drainage, but we will have a good drainage system to make sure that any ponding or puddling along the highway is eliminated and -- and that also is an ancillary benefit that -- that is occurring as a result of this project. Q Karl, a couple of things. Obviously helps out Crestmont Country Club, but with the left turn lanes improved in both directions, that -- that helps everybody just driving along Eagle Rock, whether they’re going to the country club or whether they’re using Oval Road. Correct? A That’s correct. Q So that’s all the drivers every day on Eagle Rock making -- making lefts onto Laurel? A That’s correct. Q A couple other things. We’ve got some EV improvements. We got -- I think we have 32 spaces and 3 EV credits, but we’ll -- we’ll go over that, but that’s a -- from a traffic engineering standpoint,
. Q A couple other things. We’ve got some EV improvements. We got -- I think we have 32 spaces and 3 EV credits, but we’ll -- we’ll go over that, but that’s a -- from a traffic engineering standpoint, we have some improvements due to the state statute and -- and the local ordinance on EVs? A That’s correct. And Mr. Cote can cover that further.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 49 Q Okay. And -- and we touched a little bit before. I still think we need a little variance relief from the municipal standard on driveway slopes. John will talk more about that, but we -- we have an improvement on the slopes, from -- from your standpoint? A Yeah. The -- the real key is the approach. As you -- as you approach Eagle Rock Avenue, that you have a safe slope that a vehicle can take control in inclement weather, stop in time, and that’s really set by the county. And then obviously, the control by the traffic signal so that when traffic enters onto the highway, it -- it’s controlled. And I probably should just describe how this intersection will -- will operate. It will have a multi-phase traffic signal. So basically, we’ve -- we’re designing it to operate with four phases. What’ll happen is there will be an advance phase that allows the left turns to clear and enter Oval Road while the through traffic in the eastbound direction is moving. All other approaches are stopped by that time frame. And then it goes to what’s known as a permissive operation, which is a green ball, and the through traffic on Eagle Rock Avenue is allowed to progress in both directions. And then similarly on1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 50 Oval Road, we would have left turn advances for left turning movements and then they -- both approaches would run. And what -- what effect happens from a coordination standpoint is when the Oval Road/Crestmont Country Club approaches are -- are in -- in green time, so to speak, is the same time that Laurel Avenue is moving. So that’s how your progression really works. You -- you allow that -- that operation to occur sort of simultaneously when the side streets -- at Laurel Avenue. So it’s probably worth talking about how the intersection would work. Q Karl, from a traffic standpoint, we’re -- we’re reducing the existing parking deviation by adding those 32 or 36
Laurel Avenue. So it’s probably worth talking about how the intersection would work. Q Karl, from a traffic standpoint, we’re -- we’re reducing the existing parking deviation by adding those 32 or 36 spaces. Of course, that’s -- that’s an added benefit. I think you’d agree to that. A That’s correct. And it -- it’s an independent need that Crestmont Country Club was progressing and sort of rolled into this. And -- and since the relocation and redesign of the driveway impacted that lower parking field, you know, the project just wraps all of those needs of Crestmont Country Club into one - - one package to -- for approval. Q You touched on but I’d like to bring it out just a little bit more. We have a bunch of pedestrian
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 51 crosswalks at the new signal and ADA ramps. Does that play into your opinion that we have a community benefit here? A Well, yes. Certainly, providing for a safe location to cross Eagle Rock Avenue is -- is important, so that does that. I know that there is some sidewalk lacking along Eagle Rock. There is sidewalk further to the east of us, but it does begin to create that -- that system which is being pursued by all municipalities and certainly creates a safe location for anyone that comes down Oval Road, whether it be on a bike or -- or on a -- or walking or comes out of the country club or whatever, although that’s probably not likely, to -- to have a safe crossing location; yes. Q Karl, I know you’re a near rookie in this field with only 47 years of experience, but from a traffic engineering standpoint, do you find what’s before the board tonight to be a reasonable accommodation of a potential eminent domain action, given what’s out there today in terms of -- you know, from Crestmont’s perspective? A Yeah. This is certainly the improvement that you would pursue Eagle Rock Avenue. It -- it -- you’re -- you’re -- Oval Road with the Eagle Rock Avenue is a relatively important intersection. It serves a lot of1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 52 homes. It serves the -- the Pleasantdale Chateau, the Paddle Club, so there’s public traffic moving along Oval Road aside from the residents that live up there. And then you have the safety of the traffic along Eagle Rock Road. So this -- you know, all -- everything that’s embodied in this improvement, aside from -- well, even relocating the driveway, because it comes in at an odd angle, is basically what I would call a public project. It is a project that, if funding was available, a state agency or -- or a government agency could pursue and would pursue in -- independently. Q Sir, in my opening statement I said we have a complex problem, with the eminent domain and -- and what’s out there now and we’re presenting what we believe is a reasonable, common-sense, well-engineered solution. Would you agree with that characterization? Would you care to modify it? You know, I know I’m leading you along here, but could you comment on what I had to say? A No. I -- I think that statement is
. Would you agree with that characterization? Would you care to modify it? You know, I know I’m leading you along here, but could you comment on what I had to say? A No. I -- I think that statement is accurate and as I -- I said, I’d like to take credit for this, but this pre-dates me. There’s been a lot of thinking on this over the years. I just -- it just -- as I took it over, the -- the -- my conclusions and my professional1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Pehnke - Direct 53 opinion and my -- my progressing this all come to the same conclusion that the predecessors on this project had. This is what should be done at this location and I’m assuming that is why it is in the settlement agreement. Q You see it as sort of a -- if there were public funds, it should have been done by the public. It’s -- it’s, you know, private funding is going to pay for this pursuant to the settlement agreement but you see this as -- as really, you know, in an optimal world, the public should be paying for it but there’s an opportunity to have private parties pay for it here. A Yeah. There -- there are many instances such as this where, you know, you have the needs for these types of improvements but they’re low -- low priority. So, you know, the settlement agreement obviously took advantage of the -- the funding source here to progress something that provided a benefit to -- I would say it’s more than the -- the town -- more than just the township residents and those residents along Oval Road and Crestmont Country Club, it’s the people that use Eagle Rock Road to travel through the region. It is a county facility, it is an arterial and it does provide an important function in the region.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 54 Q Okay. One last thing. You won’t mind if I correct you that the -- the private entity, Oval is West Essex Highlands, Inc., not LLC? You’re -- you’re okay with that correction. Right? A I -- I will -- I -- yes. That’s fine. Yes. Correct. Q Okay. Just so we have a clean record. A Clean record. Yes. MR. SCHKOLNICK: Chairman -- Chairman, thank you for indulging us a little bit on this, but we wanted to, you know, give you the background on -- on what we have in front of the board and in front of the community. CHAIRMAN BAGOFF: Thank you, Mr. Schkolnick. So what I’m going to do, Mr. -- thank
anted to, you know, give you the background on -- on what we have in front of the board and in front of the community. CHAIRMAN BAGOFF: Thank you, Mr. Schkolnick. So what I’m going to do, Mr. -- thank you, is carry you to July 1st, if that’s good for both of you guys? Because the hour is late and I’m sure the board has a number of questions, and then the public, and I don’t want to keep us here later than we have to, because this is a very important piece of information. MR. SCHKOLNICK: Chairman, no further public notice? CHAIRMAN BAGOFF: I’ll -- so at the moment -- MAYOR McCARTNEY: No further public notice to July 1. That’s our regular meeting.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Colloquy 55 CHAIRMAN BAGOFF: PB -- PB-26-03, Crestmont Country Club, 750 Eagle Rock Avenue, Block 174, Lot 1.01, zone R-2 will be carried to the July 1st regular planning board meeting at 7:30 p.m. via Zoom. No additional notice will be required. At that time, the board will ask question of Mr. Pehnke and then go to public questions. MR. SCHKOLNICK: Chairman, we appreciate it. Chairman, we love the allocated time slots, if that’s your inclination. On the appli -- this is a -- you appreciate this is a very expensive process. We love the allocation. Because then I don’t have to bring all my experts and we can have a sense -- so if you’re inclined, we would love for you to continue that. CHAIRMAN BAGOFF: Ms. -- Ms. McGovern will contact you and will work with you. MR. SCHKOLNICK: Thank you. We appreciate it. CHAIRMAN BAGOFF: Thank you very much. Ladies and gentlemen of the board -- THE WITNESS: Thank you. CHAIRMAN BAGOFF: So the -- the special -- thank you, Mr. Pehnke. **** (Requested presentation concluded.)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 56 CERTIFICATION I, Sarah Fetz, the assigned transcriber, do hereby certify the foregoing transcript of proceedings, 1:08:09 in duration, is prepared in full compliance with the current transcript format for judicial proceedings and is a true and accurate non-compressed transcript of the proceedings as recorded. /S/ Sarah L. Fetz AD/T 626 Sarah L. Fetz AOC Number The Digital Deposition Group 11/01/2026 Agency Name Date
KEYWORD INDEX | CRESTMONT COUNTRY CLUB West Orange Planning Board • June 3, 2026 • references: transcript page:line Keyword index • 1 0 07087 1:23 1 100 31:13 1200 36:24 146.93 10:20 174 3:11, 3:23, 55:2 2 200 46:11 2013 46:7 2020 5:22, 6:2, 27:3, 27:9, 30:1 2023 16:3, 16:21 2025 29:18, 29:19 2026 1:3, 43:7, 56:11 26-03 2:3, 3:3, 55:1 3 300 29:6 31041 1:23 5 500 1:23 6 626 1:21, 56:9 7 750 3:4, 3:10, 3:22, 55:2 8 800 36:23 A ability 6:14, 40:16 able 38:24, 45:17 about 8:4, 9:21, 10:13, 10:16, 17:20, 19:10, 20:12, 21:13, 21:15, 28:5 32:4, 33:12, 42:8, 42:21, 43:25, 46:11, 49:4, 50:11 accept 32:5 access 30:7 accessed 11:3 accommodated 40:7, 48:1 accommodation 45:22, 51:19 accomplish 8:4 accordance 41:10 accurate 32:11, 52:21, 56:6 acquire 6:8, 6:10 acres 10:13, 10:14, 10:21 across 45:18 action 51:19 activities 11:25, 40:5 activity 11:21 acute 40:10 ada 51:1 add 17:2, 22:7, 30:9, 44:13 added 41:10, 50:16 adding 13:15, 20:17, 41:9, 46:11, 50:14 addition 30:6, 39:19 additional 4:4, 4:12, 7:7, 13:13, 13:14, 13:16, 39:14, 46:12, 46:14, 55:5 additionally 11:22 address 4:21, 5:24, 8:8, 20:4, 26:5, 28:20 addressed 39:1 addresses 6:19 addressing 23:15, 46:23 adjacent 11:15, 11:19, 44:9 advance 38:25, 49:18 advances 50:1 advantage 38:4, 41:2, 41:20, 53:18 adversarial 21:6, 22:5 aerial 7:24, 10:1, 10:3, 33:6, 36:3 affect 27:21 affected 28:1 after 14:4 agency 1:22, 52:11, 56:12 ago 19:24, 29:16, 33:11, 33:13 agree 50:16, 52:17 agreement 5:22, 6:3, 6:4, 17:11, 17:25, 18:13, 20:11, 20:16, 20:18, 22:5 26:16, 26:17, 27:7, 27:16, 29:4, 29:16, 29:17, 29:20, 30:1, 30:5 33:22, 39:1, 53:5, 53:9, 53:17 ahead 8:18, 9:22, 14:6, 14:20, 26:13, 28:23, 31:23, 32:6 aicp 1:16 align 4:6 aligned 42:4 alleviate 7:18 allocated 55:9 allocation 55:12 allow 11:21, 39:13, 45:15, 47:15, 50:9 allowed 49:24 allows 49:19 along 5:3, 5:15, 7:16, 10:25, 16:13, 33:15, 33:23, 37:17, 38:15, 44:20 45:2, 45:10, 46:8, 46:13, 46:22, 47:23, 48:4, 48:11, 51:7, 52:2, 52:4 52:19, 53:21 alper 1:11, 24:20, 24:21 already 16:22, 22:16, 29:4 although 51:13 altogether 10:13, 23:21 always 22:1 america 16:9 analysis 34:19 analyzed 32:9 ancillary 48:6 angle 40:10, 41:18, 52:9