At this time a defined schedule or scope of asbestos abatement work has not been determined. However, we can estimate the cost of project monitoring based on a 10 working day abatement project. We have assumed that air sampling requirements will call for a combination of PCM and TEM analysis. This estimate should only be used for budgeting. EH! will charge for actual services provided. Asbestos Safety Technician: 10 shifts @ $680/Shifl..............sssee $ 6,800.00 Phase Contrast Analysis (Off Site): 150 samples @ $15/each. .............::2..$ 2,250.00 TEM Clearance Air Sample Analysis (Off Site): 20 samples @ $125/samople. .............. $ 2,500.00 NJ Department of Soci 8 Affairs 6% Surcharge on n Subchapter 8 Related Work (Estimated)... .$ 500.00 TASK II Estimated Total: _$ 13,580.00 per Fire Station As mentioned, the above TASK II total is an example estimate based on a 10 working day (shift) project. The above estimate should be used for budgeting only. EH! will only charge for actual services provided. Firehouse #3 Estimated Total: (TASK | & Il). Firehouse #4 Estimated Total: (TASK | & Il). GRAND TOTAL: $ 33,160.00 * The above estimates make no allowance for overtime. All work in excess of eight hours per shift, forty hours per week, or work on Saturdays and Sundays will be charged at an overtime rate of 1.5 times the basic rates identified. Work performed on Holidays will be charged at an overtime rate of 2 times the basic rates identified. As previously stated, the cost estimate is based on all work including clearance air sampling and demobilization being completed in no more than ten (10) eight (8) hour weekday work shifts. The air clearance sampling is based on 4 large work areas needing clearance per firehouse. Below is a listing of the rates we will employ for all work associated with this project $680/shift .. $85/hour Asbestos Safety Technician. Asbestos Inspector. .......... Asbestos Safety Technician Overtime Rate... $127.50/hour On-Site Microscopist (includes PCM analysis). $850/shift Project Designer... $95/hour Phase Contrast Microscopy Analysis ‘(off site) mimnsavmemencrceans 4 ofsample Transmission Electron Microscopy Analysis (off site analysis). .......... 12 Hour T/A\ $125/sample 24 Hour TIA: $ 85/sample 72 Hour T/A: $ Snaue 5 ay TA $ 40/sample Overnight shipping of samples to laboratory. .. RR $35/shipment Messenger -

Page 11

(off site analysis). .......... 12 Hour T/A\ $125/sample 24 Hour TIA: $ 85/sample 72 Hour T/A: $ Snaue 5 ay TA $ 40/sample Overnight shipping of samples to laboratory. .. RR $35/shipment Messenger - for Immediate Delivery of samples to laboratory. $200/delivery Travel: Sparta Office to Site... ... $50/trip The Asbestos Hazard Abatement Subcode (Subchapter 8) requires that the Asbestos Safety Control Monitor has no economic relationship with any other party other than the City or Municipality involved in the work. - END - Architecture & Planning NJ Certificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, NJ 07005 Telephone 973 538 3815 Facsimile 9 3.538 4095 ww stmusciano.com -3-

File revisions (1)