Supporting Documentation · Apr 24, 2018
112-18 Attachment - Herbst Musciano.pdf
ec731ec38e6953df19c8c67f3ce3edf13ca30113e96e613a48f17353948e5ae1Indexed text · page 3
Show all pagesarene HERBST MUSCIANO Lc c. Walls, replace/repair/repaint throughout Repair leak in ceiling from roof by chimney Repair shower tile d. Ceiling, repairirepaint exposed metal deck ceiling in day room Remove/replace acoustical tiles in dormitory/weight room Repair/replace/repaint all other ceilings e. Doors, replace and upgrade all interior and exterior passage doors f. Replace door hardware g. Stairs, upgrade stair rail Repair/repaint rusting stairs h. Windows, replace, double pane, low-e glass, insulated frames i. Miscellaneous, repair radiator covers, j. Treat mold in shower rooms, walls and ceilings k. Replace, urinal partition a. Replace all windows and through the wall air conditioning units with split systems for each main area b. Insulate hot water heating piping c. Evaluate condition of heat feed lines, replace as needed d. Replace/upgrade all HVAC controls e. Improve exhaust systems in bathrooms and shower areas f. Provide grills for exhaust fans in interior spaces g. Identify air compressor wiring and piping to be removed 7, ELECTRICAL Remove/replace/upgrade main panel and distribution equipment Verify active wiring. Identify wiring and equipment not used to be removed Provide additional receptacles and circuits for the watch room Update panel schedules Support and cover all exposed wiring @a90o7D 8. PLUMBING a. Upgrade all plumbing fixtures to low flow with ADA compliant flush valves and handles b. Provide pit cover for sump pump c. Provide a decontamination sink 9, FIRE ALARMS a. Review and upgrade fire alarm system as required b. Identify abandoned equipment to be removed 10. BARRIER FREE CODE, ADA COMPLIANT a. Upgrade doors, plumbing fixtures front public entrance to barrier free code and ADA compliance where necessary. b. Provide ADA Compliant water Fountain 11. ASBESTOS ABATEMENT - AS NECESSARY TO IMPLEMENT IMPROVEMENTS 12, CONSTRUCTION COST ESTIMATES 13. Energy efficient lighting was recently installed on the inside and outside of the Fire Station. This Lighting shall be incorporated into all building improvements. Fire Station No. 4 1. SITE a, New barrier free code compliant ADA front entrance 2. BUILDING ENTRANCE ~ THROUGHOUT Architecture & Planning New Jersey Cerificate of Authorization AC 830 611 Main Street, Second Floor, Boonton, NJ 07005 Telephone 973 538 3815 Facsimile 973 538 4095 nusciano.com
File revisions (1)
- Sep 29, 2026
ec731ec38e693,201,097 bytes