Supporting Documentation · Apr 24, 2018
112-18 Attachment - Herbst Musciano.pdf
ec731ec38e6953df19c8c67f3ce3edf13ca30113e96e613a48f17353948e5ae1Indexed text · page 6
Show all pagesHERBST MUSCIANO uc 2, WALLS a. Design system in split face black walls in 1997 stair tower addition to prevent water migration into CMU block of northwest stair tower 3, HVAC a. Replace all rooftop HVAC units that have not been replaced since building was renovated in 1997 4. CONSTRUCTION COST ESTIMATE 5. Rooftop HVAC units are scheduled to be replaced as part of energy efficiency improvements to this Fire Station which includes interior and exterior lighting improvements. B. ARCHITECTURAL DESIGN SERVICES 1. FIELD WORK, RESEARCH, PRELIMINARY DESIGN & CODE ANALYSIS a. Meet with the Township to discuss project requirements and goals; b. Further develop a design program with the Township's staff to define the relevant functional and operational relationships necessary for an efficient and economical facility; c. Develop conceptual designs and review them with the Township to ascertain realistic alternatives and objectives; d. Prepare preliminary drawings to illustrate program requirements e. Based upon approved preliminary documents, investigate construction and planning alternatives and prepare documents that describe the size and character of the entire project as to architectural components. f. Investigate the cost of various assemblies, components, systems, etc. 3. CONSTRUCTION DOCUMENTS PHASE a. Based on approved preliminary documents and any further adjustments in the scope and quality of the project, prepare Construction Documents for approval by the Township. These documents will consist of Drawings and specifications setting forth in detail the requirements for the construction of the project. b. Construction Documents will be prepared for the following disciplines and components: « — Architectural, General Construction. e — Plumbing and Mechanical systems fixtures and equipment. e Lighting and electrical circuits. © — Site improvements. 4, CONSTRUCTION CONTRACT ADMINISTRATION PHASE a. Unless otherwise provided in this Agreement and incorporated in the Contract Documents, the Architect will provide administration of the Contract for Construction generally as follows ¢ — The Architect will assist the Township in the process of publicly bidding the work. ¢ — Visit the site at intervals appropriate to the stage of construction to ascertain the progress of the work and its general conformity with the Construction Documents, Conduct
ly bidding the work. ¢ — Visit the site at intervals appropriate to the stage of construction to ascertain the progress of the work and its general conformity with the Construction Documents, Conduct periodic job meetings with the Contractor and Township representative. ¢ Review and approve or take the other appropriate action on Contractor's submissions of shop drawings, including pre-engineered components and product literature with respect to their conformity with the Contract Documents. ¢ Review and take action on Contractor's applications for payment. e — Prepare finish selections for all specified products and finishes. ¢ — Conduct punch list and final inspections. 5. QUALIFICATIONS a. This proposal assumes that this project will be administered and bid as a single overall lump sum contract. b. This proposal limits the duration of construction administration to a period not to exceed 4 months. c. This proposal excludes: Architecture & Planning New Jersey Cerificate of Authorization AC 830 811 Main Street, Second Floor, Boonton, NJ 07005 Telephone 973 538 3815 Facsimile 973 538 4095
File revisions (1)
- Sep 29, 2026
ec731ec38e693,201,097 bytes