Supporting Documentation · Apr 24, 2018
112-18 Attachment - Herbst Musciano.pdf
ec731ec38e6953df19c8c67f3ce3edf13ca30113e96e613a48f17353948e5ae1Indexed text · page 7
Show all pages© — Site plan (zoning) approval process. © — Building permit application e Identification, handling or abatement of contamination and hazardous or otherwise controlled materials. ¢ — Revisions to documents made after acceptance by the Township or jurisdictional agencies or authorities. ¢ — Revisions to documents due to changes made in field or due to substitution or alteration of specified materials or methods. Structural Engineering or analysis. d. The Client shall defend, hold harmless and indemnify the Architect for all claims, expenses, loss or liability (including attorney's fess) incurred during the construction and/or use of the facility when constructed in accordance with plans and specifications prepared under the terms of this agreement, except as solely by reason of the acts or omissions or negligence of the Architect. Such indemnity shall extend to include all claims, expenses, loss or liability, which occurs due to construction material or methods not in complete conformity with the requirements of the plans and specifications. e. Any controversy, dispute or question arising out of, in connection with or in relation to this agreement or its interpretation or performance or breach thereof shall be determined by arbitration conducted in New Jersey in accordance with the then existing rules of the American Arbitration Association, and judgment upon any award of damages may be entered by the highest court having jurisdiction. Each party shall select an arbitrator and selected arbitrator shall select a third arbitrator who shall conduct the arbitration. All expenses incurred or paid by reason of this arbitration, including the reasonable fees and expenses of the arbitrator shall be borne equally by the parties hereto. C. COMPENSATION 1. For the scope of work noted above: FEE PROPOSAL Repairs and Improvements Fire Station No.3 MUSCIANO ESTIMATED MAN-HOURS BY PHASE Preliminary Design, Field | contract | 5 Constuction Estimated Man] Approx Sift Resewed | “Work, Code | Documents | Bélding Phase | in Hours [Hay Rates| meur'® Research 1 [Principal Architect Engineer 0 8 8 2 12 30 $170| $ 5.100 2 [Project Architect - Engineer 0 4 12 4 8 28 $140] $ 3,920 3 |Staf Engineer - Architect 0 4 12 4 0 20 $122| $ 2440 4 [Senior Designer - Field Tech 0 1a 30 0 0 2 $109| $4578 5. [Drafer- Field Tech 0 16 64 0 40 120 $ 85] $ 10,200 6 _[Asbesios Monitoring -
3,920 3 |Staf Engineer - Architect 0 4 12 4 0 20 $122| $ 2440 4 [Senior Designer - Field Tech 0 1a 30 0 0 2 $109| $4578 5. [Drafer- Field Tech 0 16 64 0 40 120 $ 85] $ 10,200 6 _[Asbesios Monitoring - Separate 0 0 0 0 0 o js -[s_- IMan-Hours by Phase 0 a 125 10 60 240 Fee by Phase 5 $5 076($ 13.214; § 1,388 [$ 6.560 $26,238 Printing 20 sets| $1,400 Grand Total: |$_ 27,338 Continued Architer New Jersey Certificate of Authorization AC 830 611 Main Strect, Second Floor, Boonton, NJ 07005 phone 9 3815 Facsimile 973 538 4095 www.herbstmusciano.com
File revisions (1)
- Sep 29, 2026
ec731ec38e693,201,097 bytes