Show all pagesM MOTT M MACDONALD Township Ordinances for noise and would have a series of access doors as provided by the generator manufacturer. As discussed, unless applicable codes dictate otherwise, an access platform is not proposed to be included for this site, In addition to the above, the only other site improvements will be trench restoration of disturbed pavement or lawn areas, installation of bollards and pavement markings immediately adjacent to the generator. Fire House #2 (84 Washington Street) Proposed Improvements Also during the funding process, the Township requested funding for a generator for the Fire House #2. The generator was sized at 75 KW. MM's recommendation is to install the transfer switch inside the building in an electric room where the utility main service entrance will be located. This can be determined firm once we have received updated architectural and engineering plans for the building. Similar to the Municipal Building and due to the power requirements of the facility, it is recommended that a natural gas fueled system be installed. The current concept plan shows that the new generator could be located South of the building in a grass area adjacent to the vehicle driveway for the Fire Station. This generator would also be placed on a new reinforced concrete pad foundation. The generator would be a "non-Walk-In” style enclosure, sound attenuated to meet Township Ordinances for noise and would have a series of access doors as provided by the generator manufacturer. An access platform is not proposed to be included for this site. In addition to the above, the only other site improvements will be trench restoration of disturbed pavement or lawn areas, installation of bollards and pavement markings immediately adjacent to the generator. Fire House #3 (82 Ridgeway Avenue) Proposed Improvements Also during the funding process, the Township requested funding for a generator for the Fire House #2. The generator was sized at 25 KW. MM's recommendation is to install the transfer switch inside the building in the electric room where the utility main service entrance is located. This can be confirmed once we have surveyed and prepared plans for the building. Similar to the Municipal Building and due to the power requirements of the facility, it is recommended that a natural gas fueled system be installed, The current concept plan
plans for the building. Similar to the Municipal Building and due to the power requirements of the facility, it is recommended that a natural gas fueled system be installed, The current concept plan shows that the new generator could be located West of the building in a grass area adjacent to the vehicle driveway for the Fire Station. This generator would also be placed on a new reinforced concrete pad foundation. The generator would be a “non-Walk-In" style enclosure, sound attenuated to meet Township Ordinances for noise and would have a series of access doors as provided by the generator manufacturer. An access platform is not proposed to be included for this site. In addition to the above, the only other site improvements will be trench restoration of disturbed pavement or lawn areas, installation of bollards and pavement markings immediately adjacent to the generator.
File revisions (1)
- Sep 29, 2026
9928641d46247,753,557 bytes