Supporting Documentation · Jun 26, 2018
162-18 Attachment 1 a.pdf
eac91868cc46afd343d8f137aebb8e9c5e46d44244e51d1c547d989387b12e65Indexed text · page 28
Show all pagesROSELLE PARK MIDDLE SCHOOL Owner Roselle Park Board of Education Project Location Roselle Park, NJ Project Square Footage 32,239 sf Date 2006 Project Features Classrooms New Cafeteria Art Room The additions and renovations to the Roselle Park Middle school were begun in 2004 and completed in 2006. There were two additions that included (6) new classrooms, (4) new resource rooms, a media center, computer room, storage rooms, kitchen with storage, and a music room. The additions also includ- ed a handicap access elevator for the existing three story building, and a new fire exit stair. The renovations included a new cafeteria space, life skills room, offices, art room, and new exit stairs from the existing gymnasium. The heating system of the existing building was completely replaced as well as improve- ments to the electrical and plumbing systems. The additions were designed to blend with the exterior brick fagade of the existing three story building. Masonry trim, glazed block and colored metal panels were included to harmo- nize with the original 1930's vintage building. The project also included new parking lots and site lighting, improvements to the existing playing fields and new fencing THE MUSIAL GROUP ARCHITECTURE
File revisions (1)
- Sep 29, 2026
eac91868cc4611,360,876 bytes