Show all pagesSCE-P12841.011 March 7, 2022 SCE will then prepare a complete road program plan set meeting NJDOT and CDBG requirements including milling and paving where possible with supplemental full reconstruction where necessary. The plans will call for the replacement of curb, concrete sidewalks, driveway aprons, handicap ramps, and upgrades to existing catch basins and manholes as identified in the site inspection. SCE will coordinate street lighting design and specifications with Public Service Electric and Gas (PSE&G). In this task, SCE will incorporate a PSE&G red-line diagram into the design and coordinate construction details and electric service design for the proposed street lighting. An Electric Service Plan, a Lighting Plan, and technical specifications for this task will be provided meeting NJDOT project requirements. SCE will provide a cover sheet with an estimate of quantities, construction plans, soil erosion and sediment control plans, and a traffic control plan. SCE will provide technical specifications meeting NJDOT requirements and a cost estimate. SCE will provide the Township with twenty (20) copies of the complete set of design and bid package including cost estimates, plans and specifications for bidding purposes. The complete design will provide for new curbs, new sidewalks (where existing), driveway. and walkway aprons, new two (2) foot brick strip between curb and sidewalk, decorative street lighting footings/foundations and junction boxes, pavement milling and pavement resurfacing, and pavement striping. SCE also understands that Township intends to advertise bids for this project in the Summer of 2022. SCE will include one (1) round of plan revisions for regulatory review comments. Reimbursable Expenses A reimbursable fee for expenses is included as a separate line item below for all anticipated expenses associated with this project. Additional expenses will be billed on a time and material basis in accordance with the Fee Structure provided below. Reimbursable expenses may include mileage, parking and tolls, overnight postage, messenger fees, and printing expenses. Fee Proposal SCE proposes to provide the above referenced scope of services for the following fees. Invoicing for this project will summarize services provided in accordance with the Total Project fee limit indicated below. = Partial Topographic Survey $
d scope of services for the following fees. Invoicing for this project will summarize services provided in accordance with the Total Project fee limit indicated below. = Partial Topographic Survey $ 3,450 «Engineering & Electrical Services $ 21,200 * Reimbursable Expenses* Ss 1,500 TOTAL LUMP SUM FEE $ 26,150 *Includes twenty (20) Sets of Plans & Specifications including bid documents and contract agreemenis ($75 per set).
File revisions (1)
- Sep 29, 2026
bff8311defa611,058,927 bytes