Supporting Documentation · Sep 6, 2022
233-22 Attachment - Change Order No. 1 - Duct Removal.pdf
612e3d69654b37f940109900fcc8fdcb4b5d1ef9dd064d3f2285750478ec2ad4Indexed text · page 3
Show all pagesChange Order Request August 23, 2022 Ductwork / Sheet Metal Fabrication / Installation Dust & Fume Control Miad Ghaffari H&S Construction 721 Bayway Avenue Elizabeth, NJ 07202 RE: West Orange Public Library RE: Demolition of Existing Ductwork COR #1 We are pleased to provide our changed order after we were requested to demolish additional existing ductwork to make room for the new work. There is about 1100 additional linear feet of ductwork requested to demolished. The additional ductwork is shown highlighted in red sent to Airside on Monday, August 22 at 2:43pm. We are to carry demolished ductwork to dumpsters (provided by others) in parking lot within 100 ft of the building. Two men can demo between 180’-200’ of ductwork to dumpsters in a day. We are pleased to provide a cost of $20,881.26. Airside Inc. Hereby proposes provide all labor, equipment and material necessary to complete the work for the net total lump sum amount of $20,881.26, detailed as followed: Exclusions • New Work • Demo of Anything that is NOT Ductwork • Providing of Dumpsters • Any work not explicitly explained above or in the following Change Order Breakout Sheet Thank you. Michael Selvaggi Estimating 246 Brighton Road • Andover, NJ 07821 • Phone: (973) 786-6967 • Fax: (973) 786-6949
File revisions (1)
- Sep 29, 2026
612e3d69654b321,706 bytes