Supporting Documentation · Sep 6, 2022
233-22 Attachment - Change Order No. 1 - Duct Removal.pdf
612e3d69654b37f940109900fcc8fdcb4b5d1ef9dd064d3f2285750478ec2ad4Indexed text · page 4
Show all pagesAirside, Inc. Date: 8/23/2022 Tax on Material 0% Total of Material $ 1,500.00 Cost Breakdown Rev. Date Labor Rate Total of Labor Cost $ 16,357.62 Project: West Orange Public Library Foreman $ 167.82 Total of lump sum item's $ 300.00 Journeyman $ 162.53 Sub Total $ 18,157.62 Based on The Following : Mixed Rate $ 165.18 Overhead 10% $ 1,815.76 Demolition of Additional Existing Ductwork Shop Rate $ 162.53 Profit 5% $ 907.88 Change Order 1 PM/ Drafting Rate $ 167.82 Total $ 20,881.26 Items Of Extension ( with Tax on Material ) ITEM Description Qnt'y Material Hours Lump Sum Material Hrs.Total Labor Lump Sum TOTAL Demo of About 1100 Linear Feet of Exisiting Ductwork @ 200'/Day to Dumpsters provided by Others 1 $ - 0 $ - $ - 96 $ 15,856.80 $ - $ 15,856.80 Lift Rental 1 $ - 0 $ - $ 1,000.00 0 $ - $ - $ 1,000.00 Sawzal Blades, Misc Material 1 $ - 0 $ - $ 500.00 0 $ - $ - $ 500.00 PM Time 1 $ - 0 $ - $
- $ 500.00 0 $ - $ - $ 500.00 PM Time 1 $ - 0 $ - $ - 2 $ 335.64 $ - $ 335.64 Delivery 1 $ - 1 $ 300.00 $ - 1 $ 165.18 $ 300.00 $ 465.18 $ - $ - Totals of Above = $ 1,500.00 99 $ 16,357.62 $ 300.00 $ 18,157.62
File revisions (1)
- Sep 29, 2026
612e3d69654b321,706 bytes