Show all pagesHQ CONSTRUCTION & DESIGN LLC. PO BOX 7016, East Brunswick NJ 08816 732-907-9717 | ~———s PROPOSED CHANGE ORDER Proposed Change order #) Date: 9/4/2022 COMPANY: H&S Construction ATTN: Pat Blandino PROJECT: West Orange Library REQUESTED BY: Architect Description: Ticket # Job # 22-044 PO# 22-270 Construct approximatley 5 LF to underside of deck including wood blocking Frame | Carpenters 4 hours 4 Hours Carp Install Drywall 1 Carp 4 hours 4 Hours Carp 1 Drywall finisher to finish drywall 8 Hours 8 Hours Drywall finisher 1 Painter to Prime 2 hours 2 Hours Painter Materials: Metal studs 8 14.48 $115.84 Drywall 3 22.58 $67.74 Misc Tape Spackle Screws $42.15 Paint No Charge LABOR: Total materials cost: $225.73 Classification Hours Rate Sub Total Laborer 0 $84.57 0 Laborer For 0 $90.32 0 Carp 8 106.81 854.48 Carp For 0 $122.72 0 Drywall finish 8 $88.60 708.8 Rodman. 0 $119.12 0 Mason for 0 $108.90 0 Mason 0 $101.34 0 Painter For 0 $95.12 0 Painter 2 $89.60 179.2 Total labor cost: $1,742.48 Subtotal $1,968.21 Profit & Overehad 10% $196.82 Total change to contract: $2,165.03 Approved by: Signature:
File revisions (1)
- Sep 29, 2026
0df885df8c6e2,514,925 bytes