Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Sep 20, 2022

247-22 Attachment.pdf

Preserved file SHA-2560df885df8c6ebdd8200fa33890f3e5e123d559c3adcc903a8e816177e37ba5b3

Indexed text · page 7

Show all pages
Page 7

HQ CONSTRUCTION & DESIGN LLC. PO BOX 7016, East Brunswick NJ 08816 732-907-9717 ; PROPOSED CHANGE ORDER Proposed Change order # Date: 9/6/2022 COMPANY: H&S Construction ATTN: Pat Blandino PROJECT: West Orange Library REQUESTED BY: Architect Description: Ticket # Job # 22-044 PO# 22-270 Extend Trench for new sewer connection in staff lavatory 1 Laborer 4 hours and remove 1 Mason 4 Hours to pour concrete Materials: Concrete Disposal $50.00 Concrete $89.54 LABOR: Total materials cost: $139.54 Classification Hours Rate Sub Total Laborer 4 $84.57 338.28 Laborer For 0 $90.32 0 Carp 0 106.81 0 Carp For 0 $122.72 0 Drywall finish 0 $88.60 0 Rodman 0 $119.12 0 | Mason for 0 $108.90 0 | Mason 4 $101.34 405.36 Painter For 0 $95.12 0 Painter 0 $89.60 0 Total labor cost: $743.64 Subtotal Profit & Overehad 10% $88.32 Total change to contract: $971.50 Approved by: Signature:

File revisions (1)