One One Katherine Katherine Street Street Little Little Ferry, Ferry, NJ NJ 07643 07643 tel: 201.641.0600 tel: 201.641.0600 arcari iovino www.aiarchs.com www.aiarchs.com ARCHITECTS PC Edward Edward Arcari, Arcari, AIA, AIA, PP PP Anthony Anthony Iovino, Iovino, AIA,

Page 6

Iovino, AIA, AIA, PP, PP, LEED LEED September 12, September 12, 2022 2022 SATA John Gross, Business John Gross, Business Administrator/CFO Administrator/CFO Township Township ofof West West Orange Orange 66 Main 66 Main Street Street West Orange, West Orange, NJNJ 07052 07052 RE: RE: 10 Rooney 10 Rooney Circle Circle -- Proposal Proposal for for Evaluation Evaluation of of Existing Existing Systems Systems Dear Mr. Dear Mr. Gross, Gross, It is It is our our pleasure pleasure to to present present this this professional professional services services proposal proposal to to evaluate evaluate the the existing existing mechanical, electrical mechanical, electrical and and plumbing plumbing systems, systems, as as well well as

Page 6

plumbing systems, systems, as as well well as as the the building building envelope envelope of of the the 10 10 Rooney Circle Rooney Circle building. building. The The purpose purpose of of this this evaluation evaluation isis to to determine determine the the current current condition/capacity and condition/capacity and provide provide anan opinion opinion for for continued continued useuse and and future future upgrades, upgrades, including including an idea an idea of of cost. cost. We would We would engage engage an an MEP MEP consultant consultant Shine

Page 6

cost. We would We would engage engage an an MEP MEP consultant consultant Shine Shine Engineering, Engineering, who who is is the the engineer engineer of of record record for for the library the library project. project. They are familiar They are familiar with with the the building building and and have have aa good good understanding understanding ofof what is what is required required for for this this task. task. We We would would consult consult with with aa roofing roofing manufacturer manufacturer who who would would inspect the inspect the existing existing roof

Page 6

who would would inspect the inspect the existing existing roof roof and and provide provide an an opinion opinion on on product product life life and and recommendations. recommendations. We We typically work typically work with with GAF GAF roofing. roofing. Tasks associated with Tasks associated with the the Evaluation Evaluation include include thethe following: following: •eo Meet Meet with existing personnel to review existing conditions with existing personnel to review existing conditions and and issues. issues. •e Evaluate Evaluate the the existing existing HVAC HVAC system. system. •e Perform Perform preliminary preliminary heating heating andand cooling cooling calculations calculations toto size size the the HVAC

Page 6

size the the HVAC HVAC equipment equipment and evaluate and evaluate the the condition condition of of the the equipment. equipment. •e Evaluate Evaluate the the existing existing electrical electrical service service for for condition condition and and capacity. capacity. •e Evaluate Evaluate the the plumbing plumbing systems systems for for future future reuse. reuse. •e Provide Provide opinion opinion ofof potential potential cost cost for for future future upgrades. upgrades. •e Present Present the the results results to to designated designated personnel. personnel. Our fee Our fee for for this this service service is is Fifteen Fifteen Thousand

Page 6

e Our fee for for this this service service is is Fifteen Fifteen Thousand Thousand Dollars Dollars ($15,000). ($15,000). A r c h i t e c t u r e Architecture P l a n n i n g Planning IInterior n t e r i o r D De e ssign i g n