Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 22, 2022

295-22 Attachment.pdf

Preserved file SHA-256f1e4a209d8d83d35f3b67b83d2a64970c9da857249c4bc2eba82338b3ff1d5fa

Indexed text · page 1

Show all pages
Page 1

TOWNSHIP OF WEST ORANGE 25 LAKESIDE AVENUE, WEST ORANGE, N.J. 07052 DEPARTMENT OF PUBLIC WORKS ROBERT D. PARISI Tel: (973) 325-4160 Mayor Fax; (973) 669-9588 Email: Engineering@westorange.org LEONARD R. LEPORE Director, Municipal Engineer Memorandum TO: PAULA REYNOLDS PURCHASING AGENT FROM: LEONARD R. LEPORE, MUNICIPAL ENGINEER ‘a gz L DIRECTOR OF PUBLIC WORKS DATE: NOVEMBER 1, 2022 SUBJECT: EMERGENCY CONSTRUCTION CONTRACT GLEN ROAD SPILLWAY Pursuant to N.J.S.A. 40A:11.6a, I am notifying you of the need to perform a contract of an emergency nature to immediately reconstruct a deteriorating spillway on the West Fork, East Branch of the Rahway River at Glen Road. The spillway will be reconstructed as per the attached proposal of Grabowski Construction, Inc. dated October 25, 2022. Not only will the spillway be reconstructed but an emergency accessway will be installed. The cost of the work as outlined is $49,810.00, but it includes exclusions. I am requesting contingencies of $15,190.00 for a total of $65,000.00 for both the excluded items and any unexpected conditions. A Resolution will be prepared for the next Council meeting. LRL/tb Ce: John Gross Lou Reynolds

File revisions (1)