Supporting Documentation · Jan 10, 2023
12-23 Attachment - Change Order No. 7.pdf
111b5b50497a66fd63d03435e44bee6363a97b683efdaa0f5a385ff6db21892fIndexed text
Change Order AIA Document G701' - 2017 PROJECT: (Name and address) West Orange Public Library 10 Rooney Circle West Orange, NJ 07052 OWNER: (Name and address) Township of West Orange 66 Main Street West Orange, NI 07052 CONTRACT INFORMATION: Contract For: General Construction Date; ARCHITECT: (Name and address) Arcari + Iovine Architects, P.C. One Katherine Street Little Ferry, NJ 07643 CHANGE ORDER INFORMATION: Change Order Number; 007 Date: December 22, 2022 CONTRACTOR: (Name and address) H&S Construction and Mechanical, Inc. 72] Bayway Avenue Elizabeth, NJ 07202 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Costs associated with doing a survey of the existing fire alarm system on TSA occupied floor. (COR #18). Add $1,735.04 The original Contract Sum was The net change by previously authorized Change Orders _5.075,000,00 7306.09 5,152,306.09 ‘The Contract Sum will be increased by this Change Order in the amount of $ $ The Contract Sum prior to this Change Order was $ $ The new Contract Sum including this Change Order will be $ The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. T VARID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Arcari + Jovino Architects, P.C. H&S Construction and Mechanical, Inc Township of West Orange ARCHITECT (Firmame) CONTRACTOR (Fir OWNER (Firm name) * SIGNATURE SIGNATORE SIGNATURE Anthony lovino, President Daniel Hemmandez, President PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE 12)23) sora. JA ~2.9 - 2.2. DATE ? DATE DATE * We agree to the amount of this change order. H&S takes exception to the amount of days not issued with this change order as requested. We reserve our rights to claim for the days lost due to this additional work and any cost associated with this change order. Ala Document
ount of days not issued with this change order as requested. We reserve our rights to claim for the days lost due to this additional work and any cost associated with this change order. Ala Document G701™ his resarved, Tas Amweacan esas This document 7 which expires on 02/22/2023, is not for resale, is licensed for onectinye use only, and may anly be used in accordance with the AIA Contract Documents” Terms of Service, To report copyright violations, e-mall conyright@aia.orq User Notes: (AB9AD ASA)
Construction Y Mechanical, [nc. General Contractors CHANGE ORDER REQUEST Date: 12/22/2022 Project: West Orange Public Library To Contractor: H&S Construction & Mechanical Inc. 721 Bayway Ave Elizabeth NJ 07202 ‘The Contract is changed as follows: ‘Sprinkler Plumbing Heating Design Owner: Township of West Orange Construction Magr Architect: Arcari & lovino Contractor: H&S Construction Field: COR: Initiation date: Project No: 22-044 18 Contract For: Completion Contract Contract Date: Costs associated with doing a survey of the existing fire alarm system on TSA occupied floor. Once this survey is done a cost for additional work can be presented per RFI#44 response tem Description ‘Company Totals 1 [Existing fire alarm survey TSA floor- see attached Lowder $ 1,440.00 2 $ - 3 $ - 4 $ - ‘Sub-Contractor Subtotal $ 1,440.00 HBS - Overhead & Profit Of SubCost_$ 72.00 Sub Contractors Total_$ 1,512.00 tem Description Company Totals 5 |PM time the Hes $ 180.00 6 Hes 7 8 8 10 rte Contractor Subtotal $ 150,00 H& S- Overhead & Profit 18% of Contractor Cost_$ 22.50 Contractors Totat_§ 172.50 ‘sub Total § 1,684.50 H&S Bond Cost 50.54 Total $ 1,735.04 The contract time will be increased by: 2 days
Lowder Electric and Construction Corp Estimate 250 Hallock Ave. Unit B Middlesex, NJ 08846 US (732) 764-6000 info@lowder.biz ADDRESS SHIP TO H & S Construction West Orange Library 721 Bayway Ave. 10 Rooney Circle Elizabeth, NJ 07202 West Orange, NJ ESTIMATE # DATE 2658 12/21/2022 WORK ORDER # CO / RFI #44 DATE DESCRIPTION QTy RATE. AMOUNT Provide fire alarm vendor to perform site visit and survey the existing 1 1,440.00 1,440.00 2nd floor DOT/TSA Tenant space to determine Potential fire alarm upgrades for fire alarm protection. Once this is performed a cost proposal can be presented for the 2nd floor additional work or replacement devices. SUBTOTAL 1,440.00 TAX 0.00 TOTAL $1,440.00 Accepted By Accepted Date Lowder Electric & Construction Corp. Lic# 17955
File revisions (1)
- Sep 29, 2026
111b5b50497a153,270 bytes