Supporting Documentation · Jan 10, 2023
12-23 Attachment - Change Order No. 7.pdf
111b5b50497a66fd63d03435e44bee6363a97b683efdaa0f5a385ff6db21892fIndexed text · page 2
Show all pagesConstruction Y Mechanical, [nc. General Contractors CHANGE ORDER REQUEST Date: 12/22/2022 Project: West Orange Public Library To Contractor: H&S Construction & Mechanical Inc. 721 Bayway Ave Elizabeth NJ 07202 ‘The Contract is changed as follows: ‘Sprinkler Plumbing Heating Design Owner: Township of West Orange Construction Magr Architect: Arcari & lovino Contractor: H&S Construction Field: COR: Initiation date: Project No: 22-044 18 Contract For: Completion Contract Contract Date: Costs associated with doing a survey of the existing fire alarm system on TSA occupied floor. Once this survey is done a cost for additional work can be presented per RFI#44 response tem Description ‘Company Totals 1 [Existing fire alarm survey TSA floor- see attached Lowder $ 1,440.00 2 $ - 3 $ - 4 $ - ‘Sub-Contractor Subtotal $ 1,440.00 HBS - Overhead & Profit Of SubCost_$ 72.00 Sub Contractors Total_$ 1,512.00 tem Description Company Totals 5 |PM time the Hes $ 180.00 6 Hes 7 8 8 10 rte Contractor Subtotal $ 150,00 H& S- Overhead & Profit 18% of Contractor Cost_$ 22.50 Contractors Totat_§ 172.50 ‘sub Total § 1,684.50 H&S Bond Cost 50.54 Total $ 1,735.04 The contract time will be increased by: 2 days
File revisions (1)
- Sep 29, 2026
111b5b50497a153,270 bytes