14-23 Attachment - Change Order 9.pdf

Preserved file SHA-2566520716ebcc4697605c75ba52ea7bc7359aa08a167666e1056ac763b0fd86aed

Indexed text

Page 1

WATA Document G701 - 2017 Change Order PROJECT: (Name and address) West Orange Public Library 10 Rooney Circle West Orange, NJ 07052 OWNER: (Name and address) Township of West Orange 66 Main Street West Orange, NJ 07052 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name and address) Arcari + Iovino Architects, P.C. One Katherine Street Little Ferry, NJ 07643 CHANGE ORDER INFORMATION: Change Order Number: 009 Date: January 4, 2023 CONTRACTOR: (Name and address) H&S Construction and Mechanical, Inc. 721 Bayway Avenue Elizabeth, NJ 07202 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Additional steel for rooftop equipment (COR #/7R1). Add $17,422.45 The original Contract Sum was 5,075,000.00 The net change by previously authorized Change Orders $ $ The Contract Sum prior to this Change Order was $ $ $ The Contract Sum will be increased by this Change Order in the amount of ‘The new Contract Sum including this Change Order will be 1S The Contract Time will be unchanged by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Ownge“and Wontractor, in which case a Change Order is executed to supersede the Construction Change Directive. NQT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. H&S Construction and Mechanical, Inc. Township of West Orange CONTRACTOR (Firm name) OWNER (Firm name) SIGNATUR SIGNATURE SIGNATURE Anthony Tovino, President Daniel Hernandez, President WZ ¥% ‘AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE Date 7 DATE DATE AIA Document G701™ - 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The “Amer can Institute of Architects,” “AIA.” the AIA Logo. and “AIA Contract Documents” are registered trademarks and may not be used wilhoul permission. This document was produced by AIA software at 12:36:16 ET on 01/04/2023 under Order No.2114292317 which expires on 02/22/2023, is not for

Page 1

registered trademarks and may not be used wilhoul permission. This document was produced by AIA software at 12:36:16 ET on 01/04/2023 under Order No.2114292317 which expires on 02/22/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA40) 1

Page 2

S & HConstruction & Mechanical, Inc. General Contractors · Sprinkler · Plumbing · Heating · Design CHANGE ORDER REQUEST Owner: Township of West Orange Construction Mngr: Date: 12/22/2022 Architect: Arcari & Iovino Contractor: H&S Construction Project: West Orange Public Library Field: COR #: 17R1 To Contractor: Initiation date: H&S Construction & Mechanical Inc. Project No: 22-044 721 Bayway Ave Contract For: Completion Contract Elizabeth NJ 07202 Contract Date: The Contract is changed as follows: Costs associated with additional steel needed to support roof top equipment as determined by structural engineer. No existing structural drawing information was given at bid time and no way to quantify what would be needed. [revised to include original rail cost credit] Item Description Company Totals 1 Supply and install rooftop steel -See attached ISE $ 20,300.00 2 Credit for 22 rails not used H&S $ (4,400.00) 3

Page 2

20,300.00 2 Credit for 22 rails not used H&S $ (4,400.00) 3 $ - 4 $ - Sub-Contractor Subtotal $ 15,900.00 H&S - Overhead & Profit Of Sub Cost $ 1,015.00 Sub Contractors Total $ 16,915.00 Item Description Company Totals 5 6 7 8 9 10 11 Contractor Subtotal $ - H & S - Overhead & Profit 15% of Contractor Cost $ - Contractors Total $ - Sub Total $ 16,915.00 H&S Bond Cost $ 507.45 Total $ 17,422.45 The contract time will be increased by: 4 days

Page 3

INDUSTRIAL SERVICES ENTERPRISES, INC. 159 Route 46 - Rockaway, NJ 07866 OFFICE: (973) 366-3939 * FAX: (973) 328-1307 www.isenj.com QUOTATION DATE: December 14, 2022 QUOTATION TO: H&S Construction & Mechanical Fax : JOB NAME: West Orange Public Library LOCATION: West Orange NJ ARCHITECT: ENGINEER: Dimitrakis DRAWINGS: S1, S2, S3, & S4 Dated: 12/6/2022 DELIVER ONLY QUOTATION AMOUNT: $9,500 OR: DELIVER AND INSTALL QUOTATION AMOUNT: $17,500 FOR GALVANIZING OF (14) BEAMS ADD $2,800 **If PE signed and sealed drawings/calculations are required for this project, please add $2,500 to this price and allow for 3 weeks for this engineering to be completed. The 3 weeks would start after the EOR gives us the actual loading information. Detailing would then start after the EOR approves the design by our engineer.** ************************************************************************************************************* I.S.E. will furnish: Complete shop drawings to be submitted to the Architect / Engineer for approval. I.S.E. will furnish and deliver for others to install: (14) Primed beams shown on S2 per A, B, & C/S3 & S4 ($9,500) OR: I.S.E. will furnish and erect: (14) Primed beams shown on S2 per A, B, & C/S3 & S4 ($17,500) I.S.E. excludes: Any and all not listed above Galvanizing (ADD $2,800) Curbs and install of curbs Cutting deck/roofing Roof infills Sales tax Angle framing Special shop primer Field touch up paint Misc metals Liquidated

Page 3

Angle framing Special shop primer Field touch up paint Misc metals Liquidated damages PE seal on shop drawings/calcs Light gage steel Aluminum of any kind Stainless steel of any kind Firewatch Steel allowance Background checks/IDs Protection of existing Off hours / Weekend work Masonry wall seismic angles Shop and Field Inspections Prevailing wages for offsite fabrications by ISE, our subcontractors, and/or vendors. Clarifications: All work will be done open shop. NON-UNION. 7am-3:30pm. Monday-Friday. The Buyer warrants and represents that the Prevailing Wage Act (FOR FIELD LABOR ONLY) DOES apply to this project, and understands that I.S.E.’s price is based on this representation. We do not include prevailing wages for offsite fabrications by ISE, our subcontractors and/or vendors. GC is to provide legal access for I.S.E.’s crane and/or equipment. All obstructions to erection of steel such as piping, ductwork, wires, etc. are to be removed by others. Steel will be painted with one coat of our standard shop grey primer. This bid does not constitute an unconditional acceptance of the Owner’s or General Contractor’s proprietary contract or subcontract form. I.S.E. reserves the right to negotiate the terms and conditions of the contract or subcontract document and is conditional on I.S.E.’s proposal being incorporated into the contract before entering into a legally binding contract. I.S.E.’s price is based on the current cost of steel. I.S.E. reserves the right to adjust our price in accordance with steel costs at the time of an order. THIS QUOTATION IS SUBJECT TO CHANGE 7 DAYS AFTER QUOTATION DATE ALL QUOTES

Page 3

osts at the time of an order. THIS QUOTATION IS SUBJECT TO CHANGE 7 DAYS AFTER QUOTATION DATE ALL QUOTES ARE SUBJECT TO CREDIT APPROVAL ************************************************************************************************************* INDUSTRIAL SERVICES ENTERPRISES, INC BY: Anthony D’Emidio Date : 12/14/2022 Accepted: Date : Email: anthony@isenj.com Cell: 973-714-9274

Page 4

Company H & S Construction & Mechanical JobName S \FastES -Local site\Wobs\H & S Bids\22-044 West Orange Library\HVAC job Material Set Bid Labor Set Commercial Run Date 5/11/22 903, Expanded View [_] ‘2 ACCU. 2 "ACCU Air Cooled Cond Unit(tons) HVAC Equipment 1 ACCU 5 ACCU Air Cooled Cond Unit (tons) HVAC Equipment 2 accu 10 ACCU Air Cooled Cond Unit (tons) HVAC Equipment 4 ACCU 12% ACCU Air Cooled Cond Unit (tons) HVAC Equipment 2. accu 20 ACCU Air Cooled Cond Unit (tons) HVAC Equipment 48S 5 BS Branch Selector HVAC Equipment 22 EQRAILS <None> EQRA LS Equipment Rails Pump & Hydronic Equipment 1VRFCASS = 5 VRF-CASS Ceiling Cassette HVAC Equipment 30 VRF-DUCTED 5 \VRF-DUCTED Ducted VRF Unit HVAC Equipment 2VRFWALL = 5 \VRF-WALL Wall Mounted VRF HVAC Equipment

File revisions (1)