Supporting Documentation · Jan 10, 2023
14-23 Attachment - Change Order 9.pdf
6520716ebcc4697605c75ba52ea7bc7359aa08a167666e1056ac763b0fd86aedIndexed text · page 3
Show all pagesINDUSTRIAL SERVICES ENTERPRISES, INC. 159 Route 46 - Rockaway, NJ 07866 OFFICE: (973) 366-3939 * FAX: (973) 328-1307 www.isenj.com QUOTATION DATE: December 14, 2022 QUOTATION TO: H&S Construction & Mechanical Fax : JOB NAME: West Orange Public Library LOCATION: West Orange NJ ARCHITECT: ENGINEER: Dimitrakis DRAWINGS: S1, S2, S3, & S4 Dated: 12/6/2022 DELIVER ONLY QUOTATION AMOUNT: $9,500 OR: DELIVER AND INSTALL QUOTATION AMOUNT: $17,500 FOR GALVANIZING OF (14) BEAMS ADD $2,800 **If PE signed and sealed drawings/calculations are required for this project, please add $2,500 to this price and allow for 3 weeks for this engineering to be completed. The 3 weeks would start after the EOR gives us the actual loading information. Detailing would then start after the EOR approves the design by our engineer.** ************************************************************************************************************* I.S.E. will furnish: Complete shop drawings to be submitted to the Architect / Engineer for approval. I.S.E. will furnish and deliver for others to install: (14) Primed beams shown on S2 per A, B, & C/S3 & S4 ($9,500) OR: I.S.E. will furnish and erect: (14) Primed beams shown on S2 per A, B, & C/S3 & S4 ($17,500) I.S.E. excludes: Any and all not listed above Galvanizing (ADD $2,800) Curbs and install of curbs Cutting deck/roofing Roof infills Sales tax Angle framing Special shop primer Field touch up paint Misc metals Liquidated
Angle framing Special shop primer Field touch up paint Misc metals Liquidated damages PE seal on shop drawings/calcs Light gage steel Aluminum of any kind Stainless steel of any kind Firewatch Steel allowance Background checks/IDs Protection of existing Off hours / Weekend work Masonry wall seismic angles Shop and Field Inspections Prevailing wages for offsite fabrications by ISE, our subcontractors, and/or vendors. Clarifications: All work will be done open shop. NON-UNION. 7am-3:30pm. Monday-Friday. The Buyer warrants and represents that the Prevailing Wage Act (FOR FIELD LABOR ONLY) DOES apply to this project, and understands that I.S.E.’s price is based on this representation. We do not include prevailing wages for offsite fabrications by ISE, our subcontractors and/or vendors. GC is to provide legal access for I.S.E.’s crane and/or equipment. All obstructions to erection of steel such as piping, ductwork, wires, etc. are to be removed by others. Steel will be painted with one coat of our standard shop grey primer. This bid does not constitute an unconditional acceptance of the Owner’s or General Contractor’s proprietary contract or subcontract form. I.S.E. reserves the right to negotiate the terms and conditions of the contract or subcontract document and is conditional on I.S.E.’s proposal being incorporated into the contract before entering into a legally binding contract. I.S.E.’s price is based on the current cost of steel. I.S.E. reserves the right to adjust our price in accordance with steel costs at the time of an order. THIS QUOTATION IS SUBJECT TO CHANGE 7 DAYS AFTER QUOTATION DATE ALL QUOTES
osts at the time of an order. THIS QUOTATION IS SUBJECT TO CHANGE 7 DAYS AFTER QUOTATION DATE ALL QUOTES ARE SUBJECT TO CREDIT APPROVAL ************************************************************************************************************* INDUSTRIAL SERVICES ENTERPRISES, INC BY: Anthony D’Emidio Date : 12/14/2022 Accepted: Date : Email: anthony@isenj.com Cell: 973-714-9274
File revisions (1)
- Sep 29, 2026
6520716ebcc4456,665 bytes