Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. 26 Columbia Turnpike Florham Park, NJ 07932 973.240.1800 Fax 973.240.1818 www.mwne.com WBE F:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 1 Via Email November 10, 2022 Ms. Zayibeth Carballo & Mr. Leonard Lepore Township of West Orange 66 Main Street West Orange, NJ 07052 Re: PROPOSAL FOR ENVIRONMENTAL SERVICES ADDITIONAL REMEDIAL INVESTIGATION ACTIVITIES AND REPORTING 55 LAKESIDE AVENUE BLOCK 115, LOTS 15 & 17 WEST ORANGE, NEW JERSEY MATRIX NO. 21-1041 Dear Ms. Carballo & Mr. Lepore: Matrix New World Engineering, Land Surveying, and Landscape Architecture, P.C. (Matrix) is pleased to provide this proposal to complete the Remedial Investigation (RI) Activities for the Former Barton Press property, located at 55 Lakeside Avenue (Block 115, Lots 15 and 17) in the Township of West Orange (Township), New Jersey (Site). The proposed work will be completed in accordance with the Site Remediation Reform Act (SRRA), N.J.S.A 58:10C-1 et seq., the Administrative Requirements for the Remediation of Contaminated Sites (ARRCS), N.J.A.C. 7:26C, the Technical Requirements for Site Remediation (TRSR), N.J.A.C. 7:26C, and applicable New Jersey Department of Environmental Protection (NJDEP) Guidance Documents. The scope of work presented herein represents the foreseeable next steps to complete the RI process for the Site based on the results of the sampling completed in May 2022, August 2022, and the Technical Consultation with NJDEP representatives on October 18, 2022. The collection of these additional samples will allow Matrix to better define areas in need to excavation and also to define functional areas where compliance averaging may be used in accordance with NJDEP protocols. Following implementation of this proposal and dependent on the results of samples collected, it is possible that additional work may be required to complete the RI for the Site. If additional work is required to complete the RI, additional proposal(s) will be prepared for approval as necessary. SCOPE OF WORK The scope of services and associated fees are described in detail below. TASK 1: LSRP OVERSIGHT AND PROJECT MANAGEMENT In accordance with the NJDEP SRRA, the ARRCS, and the TRSR, the retained
OF WORK The scope of services and associated fees are described in detail below. TASK 1: LSRP OVERSIGHT AND PROJECT MANAGEMENT In accordance with the NJDEP SRRA, the ARRCS, and the TRSR, the retained Matrix Licensed Site Remediation Professional (LSRP) will oversee the investigation activities outlined herein. This task includes project management, NJDEP correspondence and coordination, and the anticipation of future conference calls and/or meetings with the project team. As part of Task 1, Matrix will complete the following required items: • Complete the updated Public Notification requirements to reflect the retained Matrix LSRP
F:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 2 by posting a sign in accordance with N.J.A.C. 7:26C-1.7(h)2. • Prepare, distribute, and publish a fact sheet/notification letter in accordance with N.J.A.C. :26C-1.7(I) for the groundwater contamination that is migrating off-site. The notification letters will be sent to owners and tenants within 200 feet of the Site boundary. • The completion of the Annual Remediation Cost Review and Remediation Funding Source Form. TASK 2: ADDITIONAL REMEDIAL INVESTIGATION ACTIVITIES Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) The QAPP and HASP prepared for earlier investigation activities will be updated prior to the commencement of the additional RI field activities, in accordance with requirements in the TRSR and following the NJDEP QAPP Technical Guidance, and 29 CFR Parts 1910 and 1926 of the Federal Occupational Safety and Health Administration (OSHA) regulations. Due to safety concerns (i.e., mold and no power) associated with building interiors, Matrix will take special precautions when entering interior spaces. These precautions will include half face respirators, battery powered and generator powered lighting, maximized ventilation, and the buddy system. These precautions will accrue some additional costs and are included in this proposal. Exterior Soil Sampling Based on the remedial investigation activities completed in May 2022 and August 2022, there are a few areas of concern (AOCs) requiring additional delineation in accordance with the requirements of NJDEP regulations and guidance, and as discussed in our technical consult with NJDEP on October 18, 2022. These AOCs include: • AOC-2A – 500-gallon Diesel UST • AOC-3A – Rail Spur and Siding Between Former Buildings 21 and 43; • AOC-3B – Shipping Shed; • AOC-7 – Historic Sanitary and Storm Water Management; • AOC-10 – Historic Fill at Upper Parking Lot; • AOC-12A – Former Oil House; • AOC-16 – Dumpster Area; and • AOC-24 – Co-Jac Finishers Hazardous Material Storage and Handling Area. The additional RI will include the installation of up to 35 exterior soil borings to a depth of 10 to 20 feet below ground surface (ft bgs) with soil samples collected at multiple depth intervals, if required. A breakdown of the
de the installation of up to 35 exterior soil borings to a depth of 10 to 20 feet below ground surface (ft bgs) with soil samples collected at multiple depth intervals, if required. A breakdown of the exterior soil borings per AOC are as follows: • AOC-2A – 500-gallon Diesel UST o Soil Boring SB-15E - Horizontal delineation of trichloroethene (TCE) at soil borings 3B-1 and 3B-2 (please note this boring is co-located with the eastern delineation sample of AOC-3B) • AOC-3A – Rail Spur and Siding Between Former Buildings 21 and 43 (See Figure 4A-2 for reference); o Soil Boring AOC3A-5R - Vertical delineation of TCE at soil boring AOC3A-5 o Soil Boring SB-17E-1 - Horizontal delineation of TCE, mercury, and lead east of soil boring SB-17E o Soil Boring SB-17N - Horizontal delineation of mercury, lead, and copper north of soil boring SB-17 o Soil Boring 10-1S-1 - Horizontal delineation of TCE south of soil boring 10-1S o Soil Boring 10-1W-1 - Horizontal delineation of TCE west of soil boring 10-1W
F:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 3 o Soil Boring 10-1E - Horizontal delineation of TCE east of soil boring 10-1 o Soil Boring 3A-3 - Horizontal delineation of Metals east of soil boring 3A-1 • AOC-3B – Shipping Shed (See Figure 4A-3); o Soil Borings SB-15R, SB-15E, SB-15S, and SB-15W - Vertical and horizontal delineation of TCE to the east, south, and west of SB-15 o Horizontal delineation of TCE to the north of SB-15 was achieved by soil boring AOC5B-5. • AOC-10 – Historic Fill at Upper Parking Lot (See Figure 4D); o Soil Boring SB-1R – Vertical delineation of TCE at soil boring SB-1 o Soil Boring SB-28 – Horizontal delineation of TCE to the west of soil boring SB-1 o Soil Boring SB-29 – Horizontal delineation of TCE and mercury to the east of soil boring SB-1 and horizontal delineation of metals to the west of soil boring SB-2W o Soil Boring SB-2WR – Vertical delineation of metals at soil boring SB-2W o Soil Boring AOC10-14R – Shallow samples and Vertical delineation of PAHs and Metals at soil boring AOC10-14 o Soil Borings AOC10-25 and AOC10-26 – Horizontal delineation of TCE, PAHs, and metals to the west and north of AOC10-24 and AOC10-21, respectively • AOC-12A – Former Oil House (See Figure 4F-1); o Soil Boring AOC12A-10 – Horizontal delineation of TCE to the west of soil boring AOC12A-9 • AOC-16 – Dumpster Area (See Figure 4H); and o Soil Boring AOC16-5 – Horizontal delineation of TCE to the west of soil boring AOC16-2 o Soil Boring AOC16-2R – Vertical delineation of TCE at soil boring AOC16-2 • AOC-24 – Co-Jac Finishers Hazardous Material Storage and Handling Area (See Figure 4K) o Soil Boring AOC24-1R – Vertical delineation of TCE and metals at soil boring AOC24-1 o Soil Borings AOC24-2, AOC24-3, and AOC24-4 – Horizontal delineation of TCE and metals to the east, north, and west of soil boring AOC24-1 o Please note horizontal delineation to the south was completed by soil boring AOC16-1 The soil samples will be analyzed for either Chlorinated Volatile Organic Compounds (CVOC), Semi-Volatile Organic Compounds (TCL SVOC+15), and/or Target Analyte List Metals (TAL Metals), as required. For QA/QC purposes, one field blank per field day, and one trip blank per mobilization will also be collected. All samples will be
VOC+15), and/or Target Analyte List Metals (TAL Metals), as required. For QA/QC purposes, one field blank per field day, and one trip blank per mobilization will also be collected. All samples will be analyzed by a New Jersey certified laboratory on a standard turnaround time basis. The borehole will be backfilled with soil cutting collected and ground surface shall be patched with asphalt patch. Please note Matrix will collect contingent delineation samples at a few locations based on field screening and only run if the initial delineation samples identified above exceed the applicable NJDEP Soil Remediation Standards. Projected costs assume one two-day mobilization for soil investigations. Interior Soil Sampling AOC-2B Additional interior soil samples will need to be collected to complete delineation. Up to six interior soil samples will be collected from beneath the building slab and analyzed for CVOCs and/or TAL Metals. A breakdown of the interior soil borings per AOC are as follows: • AOC-2B – 500-gallon xylol UST and Associated Pump (See Figure 4B-2)
F:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 4 o Soil Borings AOC2B-3R and AOC2B-10 - Horizontal delineation of TCE to the east and south of soil boring AOC2B-5 o Soil Boring AOC2B-11 - Horizontal delineation of TCE to the west of soil boring ACO2B-7 All samples will be analyzed by a New Jersey certified laboratory on a standard turnaround time basis. The borehole will be backfilled with soil cutting collected and ground surface shall be patched with concrete. Please note Matrix will collect contingent delineation samples and only run if the initial delineation samples identified above exceed the applicable NJDEP Soil Remediation Standards. Projected costs include one one-day mobilization for interior soil investigations. Soil Sample summary table is attached for reference. Groundwater Investigation Based on the groundwater sampling activities to date, chlorinated VOCs (CVOCs specifically Trichloroethene [TCE]), Polycyclic Aromatic Hydrocarbons (PAHs) and metals were identified at concentrations above the NJDEP’s Groundwater Quality Standards (GWQS). All monitoring wells will be gauged, and up to one additional round of groundwater sampling will be completed. The groundwater samples will be collected from the monitoring wells (up to 20 wells per sampling event including the DPW monitoring wells) via low flow sampling technique. The groundwater samples will be analyzed for TCL VOC+15. In additional, Metals will be collected from select monitoring wells including MW-2 at the DPW. Water quality indicator parameters (dissolved oxygen, pH, temperature, conductivity, and ORP) will be monitored during the groundwater purging and sampling activities. For QA/QC purposes, one field blank, and one trip blank will also be collected. All groundwater samples will be analyzed on a standard turnaround time basis by a New Jersey certified laboratory. Matrix will arrange for the disposal of the non-hazardous investigative derived waste (IDW), up to 20 55-gallon drums. The IDW consist of soil cuttings and monitoring well purge water generated during well development and groundwater sampling activities. TASK 3: REMEDIAL INVESTIGATION REPORT AND REMEDIAL ACTION WORKPLAN PREPARATION AND SUBMITTAL Upon receipt of the additional RI soil sampling results,
l development and groundwater sampling activities. TASK 3: REMEDIAL INVESTIGATION REPORT AND REMEDIAL ACTION WORKPLAN PREPARATION AND SUBMITTAL Upon receipt of the additional RI soil sampling results, Matrix will evaluate the various functional areas and conduct compliance averaging as outlined in NJDEP Guidance to minimize soil excavation. A Remedial Investigation Report (RIR) and Remedial Action Workplan (RAW) and associated forms will be prepared and will summarize the results of the remedial investigation for soils, groundwater, sediments, surface water, and vapor intrusion, and the proposed remedial action. Following a review of the Draft Report by the Township of West Orange, comments will be incorporated to prepare the Final RIR/RAW that will be submitted to NJDEP. The following forms may be required during the RI/RAW: • Case Inventory Document (CID) • Authorization to Submit a Report Through NJDEP Online • Cover/Certification Form • CEA Fact Sheet • Updated Receptor Evaluation including well search spreadsheet • Alternative or New Remediation Standard and/or Screening Level Application Form
F:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 5 including the Remediation Standard Notification Spreadsheet • Full Laboratory Data Deliverables Form • Monitoring Well Certification Form A – As-Built Certification • Monitoring Well Certification Form B – Location Certification • Site and Contact Information Update Form COSTS The following are the estimated costs for the tasks described herein to complete the foreseeable Remedial Investigation Activities for the former Barton Press Site and to complete the foreseeable Site Investigation Activities for the DPW Site. All work will be conducted in accordance with the attached standard terms and conditions and LSRP Special Provisions. Task 1 – LSRP Services and Project Management Labor .....................................................................................................................$ 15,750.00 Total for Task 1 … ................................................................................................$ 15,750.00 Task 2: Remedial Investigation Activities Labor .....................................................................................................................$ 23,600.00 Direct Expenses (Soil Investigation) .......................................................................$ 25,300.00 Direct Expenses (Interior Soil Investigation) ...........................................................$ 5,800.00 Direct Expenses (Groundwater Investigation) ........................................................$ 20,600.00 Total for Task 2 ....................................................................................................$ 75,300.00 Task 3: Remedial Investigation Report Preparation and Submission Labor .....................................................................................................................$ 36,250.00 Direct Expenses .....................................................................................................$ 1,000.00 Total for Task 3…. ................................................................................................$ 36,250.00 Total Estimated Costs .........................................................................................$ 127,300.00 ASSUMPTIONS AND EXCLUSIONS This proposal is
.....................$ 36,250.00 Total Estimated Costs .........................................................................................$ 127,300.00 ASSUMPTIONS AND EXCLUSIONS This proposal is based on the following assumptions: • Access will be provided to on-site sample locations; • All field work will be completed in Level D personal protective equipment; • All samples will be analyzed on a standard turnaround time basis, unless otherwise noted; • All investigation derived waste will be disposed of as non-hazardous waste; • No additional assessment or investigation activities or LSRP documents beyond the activities identified in the scope of work are included; • All work will be completed during normal business hours; • Costs exclude any NJDEP inspections; • Costs do not include any additional NJDEP notification or reporting fees; • Costs do not include the limited Phase II Environmental Site Assessment investigations; • Costs do not include any waste classification soil sampling or disposal of the stockpiled soils; and • All external costs will be charged at cost plus 15%. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs,