Supporting Documentation · Jan 10, 2023

19-23 Proposal_55 Lakeside Avenue-REV.pdf

Preserved file SHA-25650c37505b19a19c20f095b6e240ae9e5fbe330d812ac5bcc0d9f020188120324

Indexed text · page 1

Show all pages
Page 1

Matrix New World Engineering, Land Surveying and Landscape Architecture, P.C. 26 Columbia Turnpike Florham Park, NJ 07932 973.240.1800 Fax 973.240.1818 www.mwne.com WBE F:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 1 Via Email November 10, 2022 Ms. Zayibeth Carballo & Mr. Leonard Lepore Township of West Orange 66 Main Street West Orange, NJ 07052 Re: PROPOSAL FOR ENVIRONMENTAL SERVICES ADDITIONAL REMEDIAL INVESTIGATION ACTIVITIES AND REPORTING 55 LAKESIDE AVENUE BLOCK 115, LOTS 15 & 17 WEST ORANGE, NEW JERSEY MATRIX NO. 21-1041 Dear Ms. Carballo & Mr. Lepore: Matrix New World Engineering, Land Surveying, and Landscape Architecture, P.C. (Matrix) is pleased to provide this proposal to complete the Remedial Investigation (RI) Activities for the Former Barton Press property, located at 55 Lakeside Avenue (Block 115, Lots 15 and 17) in the Township of West Orange (Township), New Jersey (Site). The proposed work will be completed in accordance with the Site Remediation Reform Act (SRRA), N.J.S.A 58:10C-1 et seq., the Administrative Requirements for the Remediation of Contaminated Sites (ARRCS), N.J.A.C. 7:26C, the Technical Requirements for Site Remediation (TRSR), N.J.A.C. 7:26C, and applicable New Jersey Department of Environmental Protection (NJDEP) Guidance Documents. The scope of work presented herein represents the foreseeable next steps to complete the RI process for the Site based on the results of the sampling completed in May 2022, August 2022, and the Technical Consultation with NJDEP representatives on October 18, 2022. The collection of these additional samples will allow Matrix to better define areas in need to excavation and also to define functional areas where compliance averaging may be used in accordance with NJDEP protocols. Following implementation of this proposal and dependent on the results of samples collected, it is possible that additional work may be required to complete the RI for the Site. If additional work is required to complete the RI, additional proposal(s) will be prepared for approval as necessary. SCOPE OF WORK The scope of services and associated fees are described in detail below. TASK 1: LSRP OVERSIGHT AND PROJECT MANAGEMENT In accordance with the NJDEP SRRA, the ARRCS, and the TRSR, the retained

Page 1

OF WORK The scope of services and associated fees are described in detail below. TASK 1: LSRP OVERSIGHT AND PROJECT MANAGEMENT In accordance with the NJDEP SRRA, the ARRCS, and the TRSR, the retained Matrix Licensed Site Remediation Professional (LSRP) will oversee the investigation activities outlined herein. This task includes project management, NJDEP correspondence and coordination, and the anticipation of future conference calls and/or meetings with the project team. As part of Task 1, Matrix will complete the following required items: • Complete the updated Public Notification requirements to reflect the retained Matrix LSRP

File revisions (1)