Supporting Documentation · Jan 10, 2023
19-23 Proposal_55 Lakeside Avenue-REV.pdf
50c37505b19a19c20f095b6e240ae9e5fbe330d812ac5bcc0d9f020188120324Indexed text · page 5
Show all pagesF:\2021\21-1041 - Township of West Orange Phase I ESAs Downtown Corridor\Proposal\Additional Remedial Investigation - 55 Lakeside\RI Proposal_55 Lakeside Avenue-REV.docx 5 including the Remediation Standard Notification Spreadsheet • Full Laboratory Data Deliverables Form • Monitoring Well Certification Form A – As-Built Certification • Monitoring Well Certification Form B – Location Certification • Site and Contact Information Update Form COSTS The following are the estimated costs for the tasks described herein to complete the foreseeable Remedial Investigation Activities for the former Barton Press Site and to complete the foreseeable Site Investigation Activities for the DPW Site. All work will be conducted in accordance with the attached standard terms and conditions and LSRP Special Provisions. Task 1 – LSRP Services and Project Management Labor .....................................................................................................................$ 15,750.00 Total for Task 1 … ................................................................................................$ 15,750.00 Task 2: Remedial Investigation Activities Labor .....................................................................................................................$ 23,600.00 Direct Expenses (Soil Investigation) .......................................................................$ 25,300.00 Direct Expenses (Interior Soil Investigation) ...........................................................$ 5,800.00 Direct Expenses (Groundwater Investigation) ........................................................$ 20,600.00 Total for Task 2 ....................................................................................................$ 75,300.00 Task 3: Remedial Investigation Report Preparation and Submission Labor .....................................................................................................................$ 36,250.00 Direct Expenses .....................................................................................................$ 1,000.00 Total for Task 3…. ................................................................................................$ 36,250.00 Total Estimated Costs .........................................................................................$ 127,300.00 ASSUMPTIONS AND EXCLUSIONS This proposal is
.....................$ 36,250.00 Total Estimated Costs .........................................................................................$ 127,300.00 ASSUMPTIONS AND EXCLUSIONS This proposal is based on the following assumptions: • Access will be provided to on-site sample locations; • All field work will be completed in Level D personal protective equipment; • All samples will be analyzed on a standard turnaround time basis, unless otherwise noted; • All investigation derived waste will be disposed of as non-hazardous waste; • No additional assessment or investigation activities or LSRP documents beyond the activities identified in the scope of work are included; • All work will be completed during normal business hours; • Costs exclude any NJDEP inspections; • Costs do not include any additional NJDEP notification or reporting fees; • Costs do not include the limited Phase II Environmental Site Assessment investigations; • Costs do not include any waste classification soil sampling or disposal of the stockpiled soils; and • All external costs will be charged at cost plus 15%. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs,
File revisions (1)
- Sep 29, 2026
50c37505b19a609,266 bytes