Supporting Documentation · Mar 12, 2024
91-24 Attachment - Neglia.pdf
d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acafIndexed text · page 20
Show all pagesNEGLIA RATE SHEET - a — Morris Road, Sussex Road and Hunterdon Road from Warren Road to Township of West Orange Westover Terrace Construction Administration and Inspection | Neglia Group | Township of West Orange |2024 Road Project | Morris Road, Sussex Road and Hunterdon Road from Warren Road to Westover Terrace Project Cost Summary Design, CM & Cores Neglia Group Task Lump Sum Land Surveying Services* $ 8,400.00 Civil Engineering Services, $ 11,500.00 MA 2024 PMRS Coordination $ 1,200.00 Bid Phase Services $ 4,500.00 Design Services During Con $ 2,500.00 Plan Reproduction $ 600.00 Design Total (Lump Sum) (45 Calendar Days) $ 25,700.00 Construction Administration (90 Calendar Days )** $ 23,400.00 Material Testing (Pavement Cores)"** $ 7,200.00 Project Total $ 56,300.00 | “Right of way to be represented through the utization of existing Tax Maps. The use of Tax Maps may not support a boundary survey Deliverable ~Please separate CM proposal ***Coring and Testing Consultant to be approved Township vendor RFP- MORRIS ROAD, SUSSEX ROAD, AND HUNTERDON ROAD FROM WARREN ROAD TO WESTOVER TERRACE IMPROVEMENTS PROJECT Page | 17
File revisions (1)
- Sep 29, 2026
d32fd86d8eec42,519,504 bytes