Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 12, 2024

91-24 Attachment - Neglia.pdf

Preserved file SHA-256d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acaf

Indexed text · page 62

Show all pages
Page 62

EXPERIENCED DEDICATED NEGLIA RESPONSIVE negliagroup.com PROJECT SUMMARY Township of Berkeley Heights Berkeley Heights, NJ Neglia Group was selected by Berkeley Heights Township to provide Engineering Design and Construction Management services for various streets which are a part of the 2019 Capital Road Program. Neglia’s responsibilities in the realm of this project included rehabilitation of Hamilton Avenue (b/t Park Avenue and the dead end), Rutgers Avenue (b/t Hamilton Avenue and Mountain Avenue), and Princeton Avenue (b/t Park Avenue and the dead end). The integral design elements were pavement mill and overlay, spot pavement reconstruction, select granite block curb and concrete sidewalk replacement, handicap ramp replacement, roadway stripping, driveway apron repairs, drainage structure retrofitting and right-of-way restoration. Neglia conducted a topographic survey extending to the full width of the right-of-way project limits. Project at a Glance Client: The Township of Berkeley Heights Contact: Ms. Liza Viana, Township Administrator (973)-464-2700 Location: Berkeley Heights, NJ Union County Services Provided: Topographic Survey Construction Management Engineering Design Completion: February 2020 Construction Value: $350,313.42 LYNDHURST MOUNTAINSIDE 34 Park Avenue 200 Central Avenue PO Box 426 Suite 102 Lyndhurst, NJ 07071 Mountainside, NJ 07092 p. 201.939.8805 f, 201.939.0846 p. 201,.939,8805 f. 732.943.7249

File revisions (1)