Supporting Documentation · Mar 12, 2024
91-24 Attachment - Neglia.pdf
d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acafIndexed text · page 70
Show all pagesSECTION 1 Scope of Services / Fee Schedule Greenman-Pedersen, Inc. (GPI) understands that the Township of West Orange requires engineering, surveying, and construction management services necessary for the MA FY 2024 NJDOT Municipal Aid Program Morris Road, Sussex Road, and Hunterdon Road from Warren Road to Westover Terrace Improvements Project. Throughout the firm's 58-year history we have provided capital improvement project design to dozens of New Jersey municipalities. We have also served as the municipal engineer for various municipalities throughout the firm's existence. We are very experienced in providing road reconstruction design, plans, specifications and contract documents of a professional nature in a cost effective and timely manner. We recommend commencing our work with a start-up meeting. This will allow us to understand your concerns and can advance the project in an expeditious manner. Professional services will include base map preparation, a complete design and bid package or packages including cost estimates, plans and specifications (twenty copies each) for bidding purposes. We have reviewed the proposed tasks contained in the RFP, visited the sites, and we believe we have a clear understanding of the goals of this project. The RFP specifies the following improvements: 1. SURVEYING SERVICES A. Topographic Survey and Base Mapping that will provide a topographic field survey and base mapping suitable for the proposed improvements, which will include, but will not be limited to, the following items: 1. Establishment of centerline of existing street. 2. Topographic survey of all trees, shrubs, walls, driveways, walks, steps, and other existing features within the ROW and farther where necessary to the proposed improvements. 3. Right of way will be shown from available Township Tax Map information. 4. Topographic Survey including additional topography behind the curb and sidewalk of the roadways and at road intersections. 5. Top and Bottom of curb elevations, storm inlets with inverts and pipe sizes, sanitary manholes with rim elevations, and any other utilities visible on the roadways will need to be located. B. Establish horizontal control based on North American Datum 1983 (New Jersey State Plane Coordinate System-NAD 83) and North American Vertical Datum 1988 (NAVD 88); C. Benchmark(s) to be set on site for future use; D.
tal control based on North American Datum 1983 (New Jersey State Plane Coordinate System-NAD 83) and North American Vertical Datum 1988 (NAVD 88); C. Benchmark(s) to be set on site for future use; D. Existing conditions/Survey Control plan; E. Coordinate utility mark-outs; As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey will be provided to the Township. GPI Scope of Services | Page 2
File revisions (1)
- Sep 29, 2026
d32fd86d8eec42,519,504 bytes